Télécharger Imprimer la page

Keysight AC6800B Serie Guide D'utilisation Et D'entretien page 177

Publicité

Les langues disponibles

Les langues disponibles

Step
Description
1
Select the low voltage
range.
2
Select the first voltage
calibration point.
3
Measure the output voltage
with the DMM and enter the
data.
4
Repeat steps 2 and 3 for the second, third, fourth, and fifth calibration points. Note that the SCPI
command should use P2, P3, P4, and P5 in place of P1. Similarly, the front-panel Enter P1 meas-
ured data message from step 2 will indicate P2, P3, P4, or P5.
5
Select Next or press Back to finish this part of the calibration.
AC Voltage High Range
Use the same DMM configuration as for the AC Voltage Low Range calibration.
Step
Description
1
Select the high voltage
range.
2
Select the first voltage
calibration point.
3
Measure the output voltage
with the DMM and enter the
data.
4
Repeat steps 2 and 3 for the second, third, fourth, and fifth calibration points. Note that the SCPI
command should use P2, P3, P4, and P5 in place of P1. Similarly, the front-panel Enter P1 meas-
ured data message from step 2 will indicate P2, P3, P4, or P5.
5
Select Next or press Back to finish this part of the calibration.
Current Low Range
Connect a precision shunt resistor to the output. The shunt resistor should be able to measure at least
120% of the output's full-scale current. Connect the Keysight 3458A DMM across the shunt resistor.
Connect the Keysight 6060B electronic load to the AC source's output. Select the full-scale (FS), Low
Range current measurement value from the Current Table for the model being calibrated, 4 A for the
AC6801B.
Keysight AC6800B Series Operating and Service Guide
Front Panel
[Menu] > System > Admin > Cal >
AC.
Then select the Low range.
Select Next. The information field should
indicate:
Enter P1 measured data
Enter the measurement from the external
DMM in the Measured Data field. Press
[Select] or [Enter] when done.
Front Panel
[Menu] > System > Admin > Cal >
AC.
Then select the High range.
Select Next. The information field should
indicate:
Enter P1 measured data
Enter the measurement from the external
DMM in the Measured Data field. Press
[Select] or [Enter] when done.
4  Calibration, Verification, and Service
SCPI
CAL:VOLT 155
CAL:LEV P1
*OPC?
CAL:DATA <data>
SCPI
CAL:VOLT 310
CAL:LEV P1
*OPC?
CAL:DATA <data>
177

Publicité

loading

Ce manuel est également adapté pour:

Ac6801bAc6802bAc6803bAc6804b