È Fasten the TPS lead (in the
sub wire harness) under the
frame so that it does not con-
tact the carburetor.
Ô Fasten the TPS lead under the
coupler to the frame with a
plastic locking tie.
Pass the carburetor breather
hose
and
overflow
between the connecting rod
and cross tube (frame).
Ò Fasten the neutral switch lead
and oil hose together with a
plastic locking tie.
˜ Fasten the neutral switch lead
to the frame with a plastic
band.
ˆ Fasten
the
cylinder
breather hose with the hose
holder.
CABLE ROUTING DIAGRAM
Ø Fasten the neutral switch lead
and
CDI
together with a plastic band.
∏ Pass the clutch cable through
the cable guide.
Œ Pass
the
breather hose along the inner
side of the radiator pipe.
 Pass the clutch cable between
hose
the frame and radiator and
over the lower boss on the
radiator.
Í Pass the neutral switch lead
and CDI magneto lead over
the middle radiator mounting
boss. Then, pass the decom-
pression cable under the mid-
head
dle radiator mounting boss
and along the left side of the
neutral switch lead and CDI
magneto lead.
2 - 39
Ê Pass the clutch cable through
magneto
lead
the cable guide.
Ë Fit the brake hose into the
guide on the protector.
◊ Fasten the ignition coil lead
cylinder
head
(in the sub wire harness) on
the upper inside of the frame
and cut off the tie end.
„ Pass the ignition coil lead (in
the sub wire harness) under
the cushion bracket (frame).
≈ Fasten the ignition coil lead
(in the sub wire harness) to
the frame with a plastic lock-
ing tie and cut off the tie end.
Á Pass the carburetor breather
hoses and overflow hose so
that all there hoses do not
contact
absorber.
SPEC
the
rear
shock