B
Fig. 107: Installing the shatter protection (up to the 2nd
quarter of 2014)
D
Fig. 108: Installing the shatter protection (from the 3rd quar-
ter of 2014)
120 cm
(47 in)
Fig. 109: Job site with shatter protection
OM 803 us – Edition 3.7 * 803b330.fm
Installing (up to the 2nd quarter of 2014)
A
1
Follow the safety instructions for assembly
– see chapter
2
Lower the boom to the ground.
3
Stop the engine
4
Raise the lock lever
– see chapter
– see chapter
5
Remove the starting key
6
With the help of two persons, carefully slide shatter protection A from above into
the guide rails.
7
Secure the shatter protection on either side with two linch pins B.
Installing (from the 3rd quarter of 2014)
Perform steps 1 – 6 as described above.
C
Secure the shatter protection with cross brace C and one split pin D on the left and right.
Removing
Remove in the reverse order.
D
Job site
Height of working area: 120 cm (47 in).
The figures refer to work with a Wacker Neuson hydraulic hammer.
Working with another attachment can modify the height of the working area.
Parking the machine on page 3-26.
Lock lever (up to serial no. AI00814) on page 3-62
Lock lever (from serial no. AI00815) on page 3-62
Information!
Operation
3-49

Publicité

loading

Produits Connexes pour Wacker Neuson 803

Ce manuel est également adapté pour:

803 dual power