Page 1
RES 9.5EC – 13EC – 18EC 12TEC – 16TEC Manuel d’installation, d’utilisation et d’entretien (notice originale) Installation, operation and maintenance manual Manual de instalación, uso y mantenimiento 33522911801_2_1...
2.3.6.3. Conversion entre carburants ........................17 2.3.6.3.1. Conversion entre carburants RES 9.5 EC / RES 13 EC / RES 12 TEC ..........18 2.3.6.3.2. Conversion entre carburants RES 18 EC / RES 16 TEC ..............21 2.3.7 Raccordements électriques ............................24 2.3.7.1.
Page 4
4.1.4 Refroidisseur d'huile RES 18 EC / RES 16 TEC ..................... 63 4.1.5 Bougies d'allumage ..............................64 4.1.6 Filtre à air ..................................65 4.1.6.1. Entretien du filtre à air RES 9.5 EC / RES 13 EC / RES 12 TEC ............65 4.1.6.1.1. Filtre à air et préfiltre ............................ 65 4.1.6.1.1.1.
Les informations contenues dans ce document sont basées sur les informations les plus récentes disponibles au moment de l’impression. SDMO Industries se réserve le droit de modifier la présente publication, ainsi que les produits qui y sont représentés, sans aucun préavis et sans qu'aucun préjudice d'aucune sorte ne puisse lui être opposé.
25. Position de la batterie de démarrage du moteur 11. Emplacement des bougies d’allumage (des deux côtés) 12. Tuyau de vidange d’huile 13. Robinet de vidange d’huile Figure 2.1 : Position des composants du groupe électrogène, RES 9.5 EC / RES 13 EC / RES 12 TEC 4/73...
Page 7
Silencieux 16. Plaque signalétique (sur la base) Jauge d’huile 17. Robinet de vidange d’huile Bouchon de remplissage d’huile 18. Sortie d'échappement Filtre à air 19. Carte relais Emplacement des bougies d’allumage (des deux côtés) 20. Ouverture d’accès au dispositif de réchauffage du Filtre à...
1. Bouton d’arrêt d’urgence 2. Disjoncteur (+ protection différentielle en option) 3. Presse-étoupes Figure 2.3 : Position des composants du groupe électrogène 2.2. Caractéristiques générales 2.2.1 Génératrice Le groupe électrogène utilise un système exclusif de régulation de la tension (PowerBoost™), qui réagit instantanément à la moindre variation de charge.
2.2.3 Contrôleur ADC ® Le groupe électrogène est équipé d’un contrôleur Kohler ADC 2100 ou ADC-RES (Advanced Digital Control). Ce contrôleur est doté des caractéristiques spéciales suivantes : Structure compacte Intégration totale au groupe électrogène Affichage par LED : Du nombre d’heures de fonctionnement ...
à cet effet dans l’embase pour soulever le groupe électrogène complet. Voir les figures 2.6 et 2.8 relatives à l’emplacement des ouvertures destinées au levage. Modèle Poids, kg (lb) RES 9.5 EC 180 (400) RES 13 EC 186 (410)
Page 12
Figure 2.6 : Dimensions du groupe électrogène et instructions d’assemblage, RES 9.5 EC / RES 13 EC / RES 12 TEC 10/73...
Page 13
Figure 2.7 : Dégagements autour du groupe électrogène, RES 9.5 EC / RES 13 EC / RES 12 TEC 11/73...
Page 14
Figure 2.8 : Dimensions du groupe électrogène et instructions d’assemblage, RES 18 EC / RES 16 TEC 12/73...
Page 15
Figure 2.9 : Dégagements autour du groupe électrogène, RES 18 EC / RES 16 TEC 13/73...
Respecter les valeurs de dégagements indiquées sur les figures 2.7 et 2.9. Ligne d’échappement 60 Hz 50 Hz Débit des gaz d’échappement à la puissance nominale, /min. RES 9.5 EC RES 13 EC / RES 12 TEC RES 18 EC / RES 16 TEC sortie Température d’échappement 216 (420) d’enveloppe, à...
Raccord de l’arrivée 1/2" NPT Pression d’alimentation en kPa, 1,3-2,7 1,7-2,7 RES 9.5 EC / RES 13 EC / RES 12 TEC Pression d’alimentation en kPa, 1,7-2,7 RES 18 EC / RES 16 TEC Valeurs de pouvoir calorifique nominales (Btu/ft...
1" 1/4 NPT 91,5 68,6 Figure 2.17 : Longueur maximale du tuyau de gaz naturel, RES 9.5 EC / RES 13 EC / RES 12 TEC Recommandation en matière de taille minimale du tuyau de gaz, pouce NPT Gaz naturel...
2.3.6.3. Conversion entre carburants Le système polycarburant permet la conversion du gaz naturel vers le propane liquide (PL) et inversement sur site, avec maintien de la conformité aux normes antipollution. Cette conversion du système d'alimentation peut être effectuée par n'importe quel technicien qualifié...
Voir la figure 2.19 relative à la position des divers composants du circuit d’alimentation. 1. Position du connecteur DSAI 2. Bloc d’alimentation 3. Arrivée de carburant, 1/2" NPT femelle Figure 2.19 : Position des composants du circuit d’alimentation, côté admission d’air, RES 9.5 EC / RES 13 EC / RES 12 TEC 18/73...
Page 21
2. Régulateurs débitmétriques — scellés en usine, ne pas régler 3. Arrivée de carburant, 1/2" NPT 4. Raccord pour tuyau souple 5. Obturateur Figure 2.20 : Raccords du bloc d’alimentation, mode gaz naturel, RES 9.5 EC / RES 13 EC / RES 12 TEC 19/73...
Page 22
Pour convertir le groupe électrogène du PL vers le gaz naturel, appliquer la même procédure, en introduisant le raccord d’alimentation de l’orifice du PL dans l’orifice du gaz naturel. Sur les modèles RES 13 EC et RES 12 TEC, débrancher les câbles électriques du module DSAI en mode PL.
2.3.6.3.2. Conversion entre carburants RES 18 EC / RES 16 TEC Un orifice est utilisé dans la conduite de carburant pour le PL. Le groupe électrogène est habituellement livré avec un réglage pour le gaz naturel, l’orifice desserré étant attaché près de la conduite de carburant. Pour effectuer une conversion vers le PL, installer l’orifice et débrancher les câbles électriques d’avance à...
Page 24
Procédure de conversion entre carburants Soulever le capot du groupe électrogène. Dévisser les deux vis de fixation du panneau latéral. 1. Vis Déposer le panneau latéral du capot. Mettre l’interrupteur général du groupe électrogène sur « OFF ». Couper l’alimentation électrique du chargeur de batterie. Débrancher la batterie de démarrage du moteur du groupe électrogène, en commençant par le câble négatif (-).
Page 25
Placer l’orifice dans le raccord de tuyau. Voir la figure 2.23. 1. Orifice du PL 2. Raccord de tuyau 3. Régulateur Figure 2.23 : Orifice du PL, RES 18 EC / RES 16 TEC 10. Glisser le tuyau souple dans le raccord et le fixer à l’aide du collier de serrage. 11.
2.3.7 Raccordements électriques Tension dangereuse. Un retour d'alimentation au réseau peut causer des dommages matériels, de graves blessures corporelles ou la mort. Si le groupe électrogène sert d'alimentation électrique de secours, installer un commutateur de transfert automatique pour prévenir toute interconnexion incontrôlée entre les sources normale et de secours d'alimentation électrique.
2.3.7.1. Raccordements (charge, démarrage à distance, préchauffage, terre) Déposer la plaque d’obturation de passage des câbles. Percer la plaque (3 trous de diamètre adapté aux presse- étoupes et aux câbles). Mettre en place des presse-étoupes dans les trous de perçage, puis reposer la plaque. Déposer le cache disjoncteur.
Page 28
6 - Bloc « VIGI » - protection différentielle (option) 7 - Câble de mise à la terre. Nota : réglage de l’inverseur normal-secours (SDMO). En mode « AUTO » et afin d’assurer un refroidissement correct du moteur avant son arrêt, il faut régler la temporisation de refroidissement du groupe sur une durée de 120 secondes.
Remarque : Pour la plupart des applications, il n'est pas nécessaire de désactiver le mode d'alimentation permanente. Les groupes électrogènes modèles RES 9.5 EC et RES 13 EC sont équipés en usine d'un chargeur de batterie pour éviter que la batterie ne se décharge.
Page 30
1. Prise du connecteur de faisceau électrique moteur (P1) 2. Emplacement du cavalier de mode d'alimentation permanente (P7) 3. Connecteur J15 4. Connecteur J16 5. Connecteurs de l'interrupteur principal du groupe électrogène Figure 2.26 : Raccordements électriques du contrôleur numérique ADC 2100 28/73...
2.3.8 Batterie 2.3.8.1. Généralités et sécurité Installer la batterie de façon à lui assurer une aération correcte. L’entretien ne doit être effectué que par du personnel qualifié. En cas de remplacement, n’utiliser que des batteries identiques à celles devant être remplacées. Ne pas jeter l'ancienne batterie au feu.
2.3.8.2. Installation Utiliser une batterie 12 V de 450 A (CCA) de capacité minimale. Le groupe électrogène utilise une masse négative avec un circuit électrique moteur de 12 V. Brancher correctement la batterie, positif sur positif et négatif sur négatif, pour éviter tout choc électrique et des dommages à la batterie et à...
1. Dispositif de réchauffage du carburateur (filtre à air déposé pour que le dispositif soit visible) 2. Câble d’alimentation du dispositif de réchauffage du carburateur Figure 2.29 : Dispositif de réchauffage du carburateur, RES 9.5 EC / RES 13 EC / RES 12 TEC 32/73...
Page 35
1. Dispositif de réchauffage du carburateur Figure 2.30 : Dispositif de réchauffage du carburateur, sur moteur, RES 18 EC / RES 16 TEC 1. Fiche électrique 2. Thermostat 3. Dispositif de réchauffage Figure 2.31 : Dispositifs de réchauffage du carburateur avec thermostat intégré 33/73...
2.3.10 Contrôle de l'installation préalablement au démarrage Les vérifications mentionnées dans ce paragraphe permettent d’assurer la mise en service du groupe électrogène. La réalisation des opérations indiquées nécessite des compétences particulières. Elles ne doivent être confiées qu’à du personnel ayant les compétences requises. Tout manquement à...
2.3.11.1. Réglage de la tension 1. Lorsque le groupe électrogène est arrêté, brancher un multimètre numérique sur les câbles de sortie ou à une prise électrique du côté alimentation du groupe électrogène. Régler le multimètre pour la mesure des tensions C.A.. 2.
Pour RES 9.5 EC / RES 13 EC, ce paramètre permet à l'utilisateur de régler le contrôleur de façon à ce qu'il puisse communiquer avec des instruments en option et il n'est disponible que sur les modèles à usage marin ou mobile. Les RES 9.5 EC / RES 13 EC sont réglés en usine pour fonctionner sans bus de communication CAN (Cn00).
Page 39
Tension batterie: Bt12 12 Vc.c. Paramètre de Cn00 Sans bus de communication CAN communication Figure 2.34 : Paramètres de configuration du contrôleur, RES 9.5 EC / RES 13 EC Paramètre Code Définition Uu01 Monophasé, 60 Hz, 120/240 Vc.a. Tension et fréquences...
2.3.13 Modes opératoires (avec le contrôleur ADC) Procédé permettant de régler la tension et la fréquence de sortie : Écran :* Régler l’interrupteur général du groupe électrogène sur « RUN » (« MARCHE »). Le moteur du groupe électrogène démarre et le contrôleur affiche le nombre d’heures de fonctionnement du moteur.
Page 41
Suite de la figure 2.36 : Écran :* Appuyer sur : Pour passer en mode réglage grossier du régulateur du régime du moteur. (Paramètre 4P) Pour augmenter ou réduire le régime du moteur suivant de grands écarts. Pour passer en mode réglage fin du régulateur du régime du moteur. (Paramètre 4P) Pour augmenter ou réduire le régime du moteur suivant de petits écarts.
Page 42
Mode de configuration du contrôleur ADC-RES : Écran : Appuyer sur le bouton de sélection et le maintenir enfoncé : Régler l’interrupteur général du groupe électrogène sur « RUN » (« MARCHE »). (Le moteur du groupe électrogène ne démarre pas.) Attendre environ 5 secondes ;...
Page 43
Figure 2.40 : Mode de configuration (paramètres de tension et fréquence nominales, configuration du groupe électrogène et du type de moteur), RES 9.5 EC / RES 13 EC 41/73...
Page 44
(« ARRÊT/RÉINITIALISATION »). * Sur l’écran indiquant le nombre d’heures de fonctionnement, X désigne tout chiffre compris entre 0 et 9. Figure 2.42 : Mode enregistrement (après configuration des paramètres du groupe électrogène) , RES 9.5 EC / RES 13 EC 42/73...
3. Utilisation du groupe électrogène Les figures 3.1 et 3.2 illustrent l’interface utilisateur des contrôleurs numériques ADC 2100 et ADC-RES présents sur le groupe électrogène. 1. Écran à LED 2. Bouton de sélection (uniquement pour la configuration et les réglages) 3.
3.1. Commandes et signalisation La figure 3.3 présente en détail les différents organes de commande et de signalisation du contrôleur ADC 2100 ou ADC-RES. Commande ou Élément Définition signalisation Indique le nombre total d’heures de fonctionnement du Nombre d’heures groupe électrogène alors qu’il est en service et en de fonctionnement l’absence de l’affichage de tout autre code.
3.1.2 Clavier du contrôleur Les trois touches du clavier du contrôleur sont « Selection », « Flèche Haut » et « Flèche Bas ». Lorsque le groupe électrogène est en service, les touches directionnelles « Flèche Haut » et « Flèche Bas » peuvent être utilisées pour se déplacer sur les écrans de données du système comme indiqué...
3.3. Arrêt du groupe électrogène Arrêt manuel 1. Laisser fonctionner le groupe électrogène à vide pendant au moins 2 minutes afin que le moteur puisse se refroidir suffisamment. 2. Mettre l’interrupteur général du groupe électrogène sur « OFF/RESET ». Le groupe électrogène s’arrête. Arrêt automatique Positionner l'interrupteur général du groupe électrogène sur «...
Page 57
Code Défaut Définition Contrôle L'équipement s'arrête immédiatement lorsqu'on actionne Arrêt par appui Vérifier la position du bouton d'arrêt bouton d'arrêt d'urgence (modèles triphasés sur bouton d’arrêt d'urgence (modèles triphasés uniquement). d’urgence uniquement). Fonction non utilisée sur les modèles monophasés. Le groupe électrogène s’arrête si la température du Vérifier que les entrées d’air et les Arrêt sur liquide...
Code Défaut Définition Contrôle Ce code de défaut s’affiche si la tension de la batterie de Vérifier caractéristiques démarrage du moteur excède 16 VCC pendant plus de nominales de la batterie ainsi que 30 secondes lorsque le moteur est éteint. Ces conditions Alerte de haute son état.
3.6. Alimentation du contrôleur Le contrôleur ADC 2100 ou ADC-RES est alimenté en électricité par la batterie de démarrage du groupe électrogène. Un cavalier situé au dos du contrôleur ADC 2100 permet à celui-ci d'être alimenté électriquement en permanence. Tous les contrôleurs ADC 2100 sont livrés avec le cavalier en position pour assurer cette alimentation permanente.
4.1. Programme d'entretien 4.1.1 Programme d'entretien RES 9.5 EC / RES 13 EC / RES 12 TEC Nature de l’opération Organe ou intervention Fréquence (1) Inspection Contrôle Remplacement Nettoyage Essai visuelle Carburant Tuyaux souples et raccords Trimestriel Niveau de remplissage du réservoir...
4.1.2 Programme d'entretien RES 18 EC / RES 16 TEC Nature de l’opération Organe ou intervention Inspection Fréquence (1) Contrôle Remplacement Nettoyage Essai visuelle Carburant Tuyaux souples et raccords Trimestriel Niveau de remplissage du réservoir Hebdomadaire principal Conduites d'alimentation Annuel Lubrification 8 heures ou avant Niveau d'huile...
4.1.3 Circuit de lubrification 4.1.3.1. Arrêt sur basse pression d'huile La fonction d’arrêt sur basse pression d’huile protège le moteur contre le risque de dommage interne en cas de chute de la pression d’huile en dessous d’une valeur minimale, suite à un défaut de la pompe à huile ou tout autre défaut. Néanmoins, cette fonction ne protège aucunement contre les dommages causés par le fonctionnement du moteur lorsque le niveau d’huile est inférieur au niveau de sécurité...
4.1.3.4. Procédure de vidange d'huile moteur 4.1.3.4.1. Procédure de vidange d'huile moteur RES 9.5 EC / RES 13 EC / RES 12 TEC Vidanger l'huile pendant qu'elle est encore chaude. 1. Vidanger l’huile. a. Ouvrir la porte du capot. b. Mettre l’interrupteur général du groupe électrogène sur « OFF ».
4.1.3.4.2. Procédure de vidange d'huile moteur RES 18 EC / RES 16 TEC Vidanger l'huile pendant qu'elle est encore chaude. 1. Vidanger l’huile. a. Soulever le couvercle du groupe électrogène. b. Dévisser les deux vis de fixation du panneau latéral. 1.
2. Remplacer le filtre à huile. a. Nettoyer la zone autour du filtre à huile. Retirer le filtre à huile en le tournant dans le sens inverse des aiguilles d’une montre à l’aide d’une clé pour filtre à huile. b. Nettoyer la portée de l’adaptateur faisant plan de joint avec le filtre à huile. c.
4.1.5 Bougies d'allumage Régler l’espace entre les électrodes de la bougie d’allumage ou remplacer les bougies d’allumage par de nouvelles bougies si nécessaire. 1. Nettoyer autour des puits de la bougie d’allumage pour empêcher que des débris ou des particules d’encrassement n’entrent dans le moteur.
4.1.6 Filtre à air 4.1.6.1. Entretien du filtre à air RES 9.5 EC / RES 13 EC / RES 12 TEC 4.1.6.1.1. Filtre à air et préfiltre L'air d'admission du moteur est filtré par un élément interchangeable en papier haute densité et par un préfiltre en mousse imbibée d'huile.
4.1.6.1.1.1. Entretien du préfiltre Appliquer la procédure suivante pour nettoyer et rehuiler le préfiltre, comme préconisé dans le programme d'entretien. Diminuer les intervalles entre nettoyages et rehuilages du préfiltre, si les conditions d’utilisation sont très poussiéreuses ou chargées en particules. 1.
4.1.6.2. Entretien du filtre à air RES 18 EC / RES 16 TEC 4.1.6.2.1. Filtre à air L’air d’admission du moteur est filtré par un élément jetable constitué de papier à haute densité. Vérifier le filtre à air quotidiennement ou avant le démarrage du groupe électrogène. Vérifier que le système du filtre à...
4.1.7 Circuit de refroidissement Le ventilateur moteur aspire l'air de refroidissement par les ouvertures pratiquées dans les flancs et côté batterie du groupe électrogène. Le ventilateur de l'alternateur aspire l'air de refroidissement par les ouvertures pratiquées dans parois latérales de l'enveloppe.
Lorsque le disjoncteur est sur ARRET, le groupe électrogène peut fonctionner, mais le courant débité par la génératrice n'alimente pas la charge. Valeur nominale du Modèle disjoncteur, Ampères RES 9.5 EC RES 13 EC RES 18 EC RES 12 TEC RES 16 TEC Figure 4.8 : Disjoncteurs de ligne...
4.1.12.3. Lubrification des cylindres 1. Déposer les bougies d'allumage. 2. Verser une cuiller à café d'huile moteur dans chaque cylindre, par le trou de bougie. Reposer les bougies d’allumage et en mettre à la masse les câbles. Ne pas rebrancher les câbles aux bougies. 3.
5.2. Diagnostic des pannes du groupe électrogène La figure 5.1 fournit des informations détaillées de diagnostic des pannes du groupe électrogène et indique les réparations possibles. Avant de remplacer toute pièce, vérifier que les branchements électriques sont correctement resserrés. Défaut(s) Cause(s) possible(s) Mesure(s) corrective(s) Vérifier si un code de défaut s’est affiché...
5.3. Codes de défaut Le contrôleur ADC (Advanced Digital Control) affiche des codes de défaut pour aider au diagnostic des pannes. Les codes de défaut utilisés, leur description et les mesures correctives préconisées sont détaillés à la figure 3.5. ldentifier et corriger la cause à l'origine du défaut. Réinitialiser ensuite le contrôleur après un arrêt sur défaut. Voir paragraphe 3.5.1.
Figure 5.4 : Tableau de diagnostic des pannes du chargeur de batterie 6. Déclaration de conformité "C.E." Nom et adresse du fabricant : SDMO, 12 bis rue de la Villeneuve, CS 92848, 29228 BREST CEDEX 2, FRANCE Description de l'équipement Groupe électrogène...
Page 77
Diameter of supply pipe ..........................16 2.3.6.3. Fuel conversion............................... 17 2.3.6.3.1. Fuel conversion RES 9.5 EC / RES 13 EC / RES 12 TEC ................18 2.3.6.3.2. Fuel conversion RES 18 EC / RES 16 TEC ....................21 2.3.7 Electrical connections ..............................24 2.3.7.1.
Page 78
Procedure for draining the engine oil ....................... 61 4.1.3.4.1. Procedure for draining the engine oil RES 9.5 EC / RES 13 EC / RES 12 TEC ..........61 4.1.3.4.2. Procedure for draining the engine oil RES 18 EC / RES 16 TEC ..............62 4.1.4 Oil cooler RES 18 EC / RES 16 TEC ..........................
1. Preface This manual explains how to install, use and maintain RES 9.5 EC and RES 13 EC equipped with ADC 2100 (Advanced Digital Control) controllers, and RES 18 EC, RES 12 TEC and RES 16 TEC model generating sets equipped with ADC-RES (Advanced Digital Control) controllers.
11. Position of spark plugs (both sides) 25. Position of engine starter battery 12. Oil drainage hose 13. Oil drainage tap Figure 2.1: Position of generating set components, RES 9.5 EC / RES 13 EC / RES 12 TEC 4/73...
Page 81
Silencer 16. Rating plate (on base) Dipstick 17. Oil drainage tap Oil filler cap 18. Exhaust outlet Air filter 19. Relay card Position of spark plugs (both sides) 20. Carburettor heating device access opening Oil filter 21. LP fuel orifice location (inside hose fitting) Oil cooler 22.
1. Emergency stop button 2. Circuit breaker (+ differential protection as an option) 3. Cable gland Figure 2.3: Position of generating set components 2.2. General specifications 2.2.1 Generator The generating set uses an exclusive voltage regulation system (PowerBoost™), which reacts instantly to the slightest variation in load.
2.2.3 ADC controller ® The generating set is fitted with a Kohler ADC 2100 or ADC-RES (Advanced Digital Control) controller. This controller has the following special features: Compact design Fully integrated into the generating set LED display showing: Hours of operation ...
The approximate generating set weights are given in figure 2.5. Use lifting bars inserted in the specially-designed openings in the base to lift the entire generating set. See figures 2.6 and 2.8 for the location of the openings for lifting. Model Weight, kg (lb.) RES 9.5 EC 180 (400) RES 13 EC 186 (410)
Page 86
Figure 2.6: Generating set dimensions and assembly instructions, RES 9.5 EC / RES 13 EC / RES 12 TEC 10/73...
Page 87
Figure 2.7: Clearance around the generating set, RES 9.5 EC / RES 13 EC / RES 12 TEC 11/73...
Page 88
Figure 2.8: Generating set dimensions and assembly instructions, RES 18 EC / RES 16 TEC 12/73...
Page 89
Figure 2.9: Clearance around the generating set, RES 18 EC / RES 16 TEC 13/73...
60Hz 50Hz Exhaust gas flow at nominal power, m /min RES 9.5 EC RES 13 EC / RES 12 TEC RES 18 EC / RES 16 TEC Exhaust gas temperature from casing outlet at nominal power, °C (°F) 216 (420) Figure 2.10: Exhaust gas flows and temperatures...
1" NPT 1" 1/4 NPT 91.5 68.6 Figure 2.17: Maximum natural gas pipe length, RES 9.5 EC / RES 13 EC / RES 12 TEC Minimum gas pipe size recommendation, in. NPT Natural gas LP vapor Pipe length, m (ft.)
2.3.6.3. Fuel conversion The multifuel system enables natural gas to be converted on site to liquid propane (LP) and vice versa, ensuring compliance with emissions standards. This fuel system conversion can be carried out by any approved agent or qualified technician. Accidental starting.
See figure 2.19 for the position of the various supply circuit components. 1. Position of DSAI connector 2. Supply unit 3. Fuel intake, 1/2" NPT female Figure 2.19: Position of supply circuit components, air intake side, RES 9.5 EC / RES 13 EC / RES 12 TEC 18/73...
Page 95
2. Flow regulators—sealed in the factory, do not adjust 3. Fuel intake, 1/2" NPT 4. Flexible hose union 5. Blanking cover Figure 2.20: Supply unit unions, natural gas mode, RES 9.5 EC / RES 13 EC / RES 12 TEC 19/73...
Page 96
To convert the generating set from LP to natural gas, apply the same procedure, feeding the supply union from the LP opening to the natural gas opening. On the RES 13 EC and RES 12 TEC models, disconnect the wires from the DSAI module in LP mode. See figure 2.21.
2.3.6.3.2. Fuel conversion RES 18 EC / RES 16 TEC For LP vapor fuel, an orifice is used in the fuel line. The unit is typically shipped set up for natural gas, with the loose orifice tied near the fuel line. To convert to LP vapor, install the orifice and disconnect the spark advance leads as described below. See figure 2.22 for the position of the various supply circuit components.
Page 98
Fuel conversion procedure Lift the generating set bonnet. Unscrew the two retaining screws of the side panel. 1. Screws Remove the side panel of the enclosure. Move the main switch on the generating set to "OFF". Isolate the battery charger from its electrical power supply. Disconnect the generating set engine starter battery, negative (-) lead first.
Page 99
Place the orifice into hose fitting. See figure 2.23. 1. LP orifice 2. Hose fitting 3. Regulator Figure 2.23: LP fuel orifice, RES 18 EC / RES 16 TEC 10. Slide the flexible hose into the union and secure it using the clamp. 11.
2.3.7 Electrical connections Dangerous voltage. Backfeed to the mains can cause death, serious injuries and damage to equipment. If the generating set uses mains electricity, an automatic changeover switch must be fitted to prevent any accidental connection between the normal and backup sources of electricity. Warning Earthing electrical equipment.
2.3.7.1. Connections (charge, remote start, preheating, earth) Remove the cable router blanking cover. Drill a hole in the cover (3 holes of the correct diameter for the cable gland and cables). Position the cable gland via the drill holes then refit the cover. Remove the circuit breaker cover.
Page 102
6 - "VIGI" module - differential protection (option) 7 - Earthing cable. Note on adjusting the normal/emergency switch (SDMO). In "AUTO" mode, to ensure the engine is correctly cooled after it is switched off, the cooling time delay for the generating set should be set to 120 seconds.
3 and 4 of the controller), or by setting the generating set's main switch to "RUN". Note: For the majority of applications, it is not necessary to deactivate the permanent supply mode. The RES 9.5 EC and RES 13 EC model generating sets are factory fitted with a battery charger to avoid the battery discharging.
Page 104
1. Engine wiring harness connector plug (P1) 2. Position of permanent supply mode jumper (P7) 3. Connector J15 4. Connector J16 5. Generating set main switch connectors Figure 2.26: Electrical connectors for ADC 2100 digital controller 28/73...
2.3.8 Battery 2.3.8.1. General information and safety Fit the battery so that it is properly ventilated. Maintenance should only be carried out by qualified personnel. If replacing the batteries, use the same type of batteries. Do not throw the old battery in the fire. Only use insulated tools (the operator should not be wearing a watch, chain or any metal object).
2.3.8.2. Installation Use a 12 V battery with minimum capacity of 450 A (CCA). The generating set uses a negative earth with a 12 V electrical circuit. Connect the battery correctly (positive to positive and negative to negative) to avoid any risk of electric shock or damage to the battery and battery charger.
Three-phase models (TEC): The carburetor heating device power is factory-connected to the battery charger. 1. Carburettor heating device (with the air filter removed so that the device is visible) 2. Carburettor heating device supply lead Figure 2.29: Carburettor heating device, RES 9.5 EC / RES 13 EC / RES 12 TEC 32/73...
Page 109
1. Carburettor heating device Figure 2.30: Carburettor heating device, on engine, RES 18 EC / RES 16 TEC 1. Power plug 2. Thermostat 3. Heating device Figure 2.31: Carburettor heating devices with integrated thermostat 33/73...
2.3.10 Installation check prior to starting The inspections referred to in this section enable the generating set to operate. Specific skills are required to carry out these operations. They must only be entrusted to personnel with the necessary skills. Failure to follow these instructions in any way could lead to incidents or very serious accidents. Warning Ensure that all the installation instructions detailed in this document have been applied.
2.3.11.1. Voltage regulation 1. With the generating set off, connect a digital multimeter to the output cables or to an electrical socket on the supply side of the generating set. Set the multimeter to measure the AC voltage. 2. Start the generating set; to do this, move the main switch to "RUN". 3.
Communications setting ("Cn" code). For RES 9.5 EC / RES 13 EC, this setting enables the user to adjust the controller so that it can communicate with optional instruments and is only available with marine and mobile models. The RES 9.5 EC / RES 13 EC are factory set for no CAN communications, Cn00.
Page 113
Battery voltage: Bt12 Engine starter battery voltage, 12 VDC Communication setting Cn00 Without CAN communications Figure 2.34: Controller configuration settings, RES 9.5 EC / RES 13 EC Parameter Code Description Uu01 Single phase, 60 Hz, 120/240 VAC Generating set nominal...
2.3.13 Operating modes (with the ADC controller) Method for adjusting the output frequency and voltage: Display:* Move the main switch on the generating set to "RUN". The generating set's engine starts and the controller displays the engine's hours of operation. Press and Wait approximately 5 seconds;...
Page 115
Continuation of figure 2.36: Display:* Press: To switch to engine speed regulator coarse adjustment mode. (Parameter 4P) To increase or reduce the engine speed by large intervals. To switch to engine speed regulator fine adjustment mode. (Parameter 4P) To increase or reduce the engine speed by small intervals. To switch to engine speed regulatory stability (gain) coarse adjustment.
Page 116
ADC-RES Controller configuration mode: Display: Press and hold the selection button: Move the main switch on the generating set to "RUN". (The generating set engine does not start.) Wait approximately 5 seconds; the screen displays the program version number. (this number may be different from the number indicated here).
Page 117
Note: The grey boxes indicate the figure displayed on the controller screen and this value can be modified by pressing the up or down arrow. Figure 2.40: Configuration mode (nominal voltage/frequency settings, configuration of the generating set and engine type), RES 9.5 EC / RES 13 EC 41/73...
Page 118
The main switch should now be set to "OFF/RESET". * On the display for hours of operation, X denotes any figure between 0 and 9. Figure 2.42: Save mode (after configuration of the generating set parameters) , RES 9.5 EC / RES 13 EC 42/73...
3. Using the generator set Figures 3.1 and 3.2 illustrate the user interface for the ADC 2100 and ADC-RES digital controllers fitted to the generating set. 1. LED display screen 2. Selection button (only for configuration and settings) 3. Up and Down arrow keys (only for configuration and settings) 4.
3.1. Controls and signals Figure 3.3 details the different control and signalling components on the ADC 2100 or ADC-RES controller. Control or signal Item Description Indicates the total number of hours of operation for the Hours of operation generating set, while it has been operating and in the absence of any other code being displayed.
3.1.2 Controller keyboard The three keys on the keypad of the controller are “Select”, “Up” and “Down”. When the generating set is running, the “Up” and “Down” arrow keys can be used to step through system data displays as shown on figure 3.4.
3.3. Stopping the generating set Manual shutdown 1. Allow the generating set to run under no load for at least 2 minutes to let the engine cool sufficiently. 2. Move the main switch on the generating set to "OFF/RESET". The generating set is switched off. Automatic shutdown With the main switch on the generating set positioned to "AUTO", open the contact across egine start wires 3 and 4 to signal the generating set to stop.
Page 131
Code Fault Description Check Shutdown by The equipment stops immediately when the emergency Check the position of the emergency pressing the stop button is activated (Three-phase models only). stop button (Three-phase models emergency stop Not used on single phase models only).
Code Fault Description Check This fault code is displayed if the voltage of the engine Check the nominal specifications of starter battery exceeds 16 VDC for more than 30 seconds the battery and the condition of the when the engine is off. These fault conditions do not High battery battery.
3.6. Controller power The ADC 2100 or ADC-RES controller is supplied with electricity by the generating set's engine starter battery. A jumper located at the rear of the ADC 2100 controller ensures a permanent supply of electricity. All ADC 2100 controllers are supplied with the jumper fitted to ensure this permanent supply.
4.1. Maintenance schedule 4.1.1 Maintenance schedule RES 9.5 EC / RES 13 EC / RES 12 TEC Nature of operation Component or operation Frequency (1) Visual inspection Check Replacement Cleaning Test Fuel Flexible pipes and unions Quarterly Main tank fill level...
4.1.2 Maintenance schedule RES 18 EC / RES 16 TEC Nature of operation Component or operation Visual Frequency (1) Check Replacement Cleaning Test inspection Fuel Flexible pipes and unions Quarterly Main tank fill level Weekly Supply pipes Annually Lubrication 8 hours or before Oil level operation Sump breather pipe...
4.1.3 Lubrication system 4.1.3.1. Shutdown due to low oil pressure The shutdown function as a result of low oil pressure protects the engine against the risk of internal damage, in the event of a drop in oil pressure below a minimum pressure, following an oil pump fault or any other fault. This function does not, however, provide any protection against damage caused by operating the engine when the oil level is below the minimum safe level;...
4.1.3.4. Procedure for draining the engine oil 4.1.3.4.1. Procedure for draining the engine oil RES 9.5 EC / RES 13 EC / RES 12 TEC Drain the oil while it is still warm. 1. Drain the oil. a. Open the door of the enclosure.
4.1.3.4.2. Procedure for draining the engine oil RES 18 EC / RES 16 TEC Drain the oil while it is still warm. 1. Drain the oil. a. Lift the generating set bonnet. b. Unscrew the two retaining screws of the side panel. 1.
2. Replace the oil filter. a. Clean the area around the oil filter. Remove the oil filter by turning it anticlockwise using an oil filter wrench. b. Clean the mating face of the adaptor in contact with the oil filter. c.
4.1.5 Spark plugs Adjust the spark plug electrode gap or replace the spark plugs with new plugs if necessary. 1. Clean around the spark plug wells, to prevent debris or clogging particles from entering the engine. 2. Remove the spark plugs and check their condition. Replace the spark plugs if they are worn or if they are unlikely to be reusable.
4.1.6 Air filter 4.1.6.1. Air filter maintenance RES 9.5 EC / RES 13 EC / RES 12 TEC 4.1.6.1.1. Air filter and pre-filter The engine intake air is filtered by a replaceable element made of high density paper and by a foam pre-filter soaked in oil.
4.1.6.1.1.1. Pre-filter maintenance Apply the following procedure to clean and lubricate the pre-filter, as recommended in the maintenance schedule. Clean and lubricate the pre-filter at more regular intervals if the operating conditions are very dusty or full of particles. 1. Open the door of the enclosure. 2.
4.1.6.2. Air filter maintenance RES 18 EC / RES 16 TEC 4.1.6.2.1. Air filter The engine intake air is filtered by a replaceable element made of high density paper. Check the air filter daily or before starting the generating set. Check that the air filter system is not clogged and there is no debris accumulated around it.
4.1.7 Cooling circuit The engine fan draws in cool air via the openings made in the sides of the generating set and on the battery side. The alternator fan draws in cool air via the openings made in the side walls of the casing. The cool air is mixed with the exhaust gases and is then expelled from the exhaust outlet.
When the circuit breaker is set to "OFF", the generating set can operate, but the power supply from the generator does not supply power to the load. Circuit breaker Model nominal value (amps) RES 9.5 EC RES 13 EC RES 18 EC RES 12 TEC RES 16 TEC Figure 4.8: Line circuit breakers...
4.1.12.3. Cylinder lubrication 1. Remove the spark plugs. 2. Add a teaspoon of engine oil to each cylinder via the spark plug hole. Refit the spark plugs and earth the cables. Do not reconnect the cables to the spark plugs. 3.
5.2. Generating set fault finding Figure 5.1 gives detailed fault finding information for the generating set and possible repairs. Before replacing any parts, check that the electrical connections are correctly tightened. Fault(s) Possible cause(s) Corrective measure(s) Fault shutdown. Check for a fault code on the controller display. Check the electrical power supply to the battery charger.
5.3. Fault codes The ADC (Advanced Digital Control) controller displays fault codes to aid fault finding. The fault codes used, their description and the recommended corrective measures are detailed in figure 3.5. Identifying the cause of the fault and correcting it. Resetting the controller after a fault-related shutdown. See section 3.5.1. 5.4.
Figure 5.4: Battery charger fault finding table 6. EC Declaration of conformity Name and address of manufacturer: SDMO, 12 bis rue de la Villeneuve, CS 92848, 29228 BREST CEDEX 2, FRANCE. Description of the equipment Generating set...
Page 151
2.3.6.3. Conversión entre carburantes ......................17 2.3.6.3.1. Conversión de combustible RES 9.5 EC / RES 13 EC / RES 12 TEC ..........18 2.3.6.3.2. Conversión de combustible RES 18 EC / RES 16 TEC ..............21 2.3.7 Conexiones eléctricas ............................. 24 2.3.7.1.
Page 152
Proceso de vaciado de aceite motor ....................61 4.1.3.4.1. Proceso de vaciado de aceite motor RES 9.5 EC / RES 13 EC / RES 12 TEC ......61 4.1.3.4.2. Proceso de vaciado de aceite motor RES 18 EC / RES 16 TEC ............ 62 4.1.4 Radiador de aceite RES 18 EC / RES 16 TEC ....................
1. Preámbulo Este manual explica cómo instalar, utilizar y mantener los grupos electrógenos modelos RES 9.5 EC y RES 13 EC equipados con controladores ADC 2100 (Control Digital Avanzado), y RES 18 EC, RES 12 TEC y RES 16 TEC equipados con controladores ADC-RES (Control Digital Avanzado).
11. Posición de las bujías de encendido (ambos lados) 12. Tubo flexible de vaciado de aceite 13. Grifo de vaciado de aceite Figura 2.1: Posición de los componentes del grupo electrógeno RES 9.5 EC / RES 13 EC / RES 12 TEC 4/73...
Page 155
Silenciador 16. Placa de características (en la base) Varilla indicadora 17. Grifo de vaciado de aceite Tapón de llenado de aceite 18. Salida de escape Filtro de aire 19. Tarjeta del relé Posición de las bujías de encendido (ambos lados) 20.
1. Botón de parada de emergencia 2. Disruptor (+ protección diferencial como opción) 3. Prensacables Figura 2.3: Posición de los componentes del grupo electrógeno 2.2. Características generales 2.2.1 Generador El grupo electrógeno utiliza un sistema exclusivo de regulación de tensión (PowerBoost™), que reacciona intensamente ante la menor variación de carga.
2.2.3 Controlador ADC ® El grupo electrógeno incorpora un controlador ADC 2100 o ADC-RES (Control Digital Avanzado) de Kohler . Este controlador presenta las características especiales siguientes: Diseño compacto Totalmente integrado en el grupo electrógeno Pantalla LED que indica: Horas de funcionamiento ...
50 Hz Caudal de gases de escape a potencia nominal, m /min. RES 9.5 EC RES 13 EC / RES 12 TEC RES 18 EC / RES 16 TEC Temperatura de los gases de escape a la salida de la 216 (420) carcasa a potencia nominal, °C (°F)
Unión de entrada NPT 1/2" Presión de suministro en kPa, 1,3-2,7 1.7-2.7 RES 9.5 EC / RES 13 EC / RES 12 TEC Presión de suministro en kPa, 1,7-2,7 RES 18 EC / RES 16 TEC Valores caloríficos nominales (Btu/ft...
NPT de 1" NPT de 1/4" 91,5 68,6 Figura 2.17: Longitud máxima del tubo de gas natural, RES 9.5 EC / RES 13 EC / RES 12 TEC Recomendación de tamaño mínimo del tubo de gas, pulg. Gas natural LP vapor...
2.3.6.3. Conversión entre carburantes El sistema multi-combustible permite convertir in situ de gas natural a propano líquido (LP) y viceversa, garantizando el cumplimiento de las normas sobre emisiones. Esta conversión del sistema de combustible puede llevarla a cabo cualquier agente aprobado o técnico cualificado.
1. Posición del conector de DSAI 2. Unidad de alimentación 3. Entrada de combustible, rosca hembra NPT 1/2” Figura 2.19: Posición de los componentes del circuito de alimentación, lado de entrada de aire, RES 9.5 EC / RES 13 EC 18/73...
Page 169
2. Reguladores de flujo— sellados en fábrica, no ajustar 3. Entrada de combustible, NPT de 1/2" 4. Unión de la manguera flexible 5. Tapón Figura 2.20: Uniones de la unidad de alimentación, modo de gas natural, RES 9.5 EC / RES 13 EC / RES 12 TEC 19/73...
Page 170
Para convertir el grupo electrógeno de LP a gas natural, aplique el mismo procedimiento, introduciendo la unión de alimentación de la abertura de LP a la de gas natural. En el modelo RES 13 EC y RES 12 TEC, desconecte los cables del módulo de DSAI en modo LP.
2.3.6.3.2. Conversión de combustible RES 18 EC / RES 16 TEC La línea de combustible presenta un orificio para el combustible de vapor de LP. La unidad se envía normalmente configurada para gas natural, con el orificio suelto atazo cerca de la línea de combustible. Para convertir a vapor de LP, monte el orificio y desconecte los cables de avance de la chispa tal como se explica a continuación.
Page 172
Procedimiento de conversión de combustible Levante el capó del grupo electrógeno. Desenrosque los dos tornillos de retención del panel lateral. 1. Tornillos Retire el panel lateral de la carcasa. Ponga el interruptor principal del grupo electrógeno en la posición "OFF". Aísle el cargador de baterías de su alimentación eléctrica.
Page 173
Coloque el orificio en la conexión del tubo flexible. Consulte la figura 2.23. 1. Orificio para LP 2. Conexión del tubo flexible 3. Regulador Figura 2.23: Orificio de combustible LP, RES 18 EC / RES 16 TEC 10. Deslice la manguera flexible en la unión y fíjela con la abrazadera. 11.
2.3.7 Conexiones eléctricas Tensión peligrosa. El restablecimiento de la alimentación de red puede causar daños materiales, lesiones corporales graves o la muerte. Si el grupo electrógeno sirve de alimentación eléctrica de emergencia, instale un conmutador de transferencia automática para prevenir cualquier conexión descontrolada entre la fuente de alimentación eléctrica normal y de emergencia.
2.3.7.1. Conexiones (carga, arranque remoto, precalentamiento, tierra) Taladre un orificio en la tapa (tres orificios con el diámetro Extraiga la tapa de distribuidor de cables. correcto para el prensacables y los cables). Coloque el prensacables a través de los orificios taladrados y vuelva a colocar la tapa.
Page 176
6 - Módulo "VIGI" - protección diferencial (opcional) 7 - Cable de tierra. Nota sobre el ajuste del interruptor normal/de emergencia (SDMO). En modo "AUTO", para garantizar que el motor está bien refrigerado después de desconectarlo, debe fijarse el retardo de refrigeración del generador en 120 segundos.
Advertencia: en la mayoría de aplicaciones no es necesario desactivar el modo de alimentación permanente. Los grupos electrógenos de modelos RES 9.5 EC y RES 13 EC están equipados de fábrica con un cargador de batería para evitar que la batería se descargue.
Page 178
1. Toma del conector de haz electrónico motor (P1) 2. Colocación del caballete de modo de alimentación permanente (P7) 3. Conector J15 4. Conector J16 5. Conectores interruptor principal grupo electrógeno Figura 2.26: Conexiones eléctricas del controlador digital ADC 2100 28/73...
2.3.8 Batería 2.3.8.1. Información general y seguridad Instale la batería de tal modo que reciba una aireación adecuada. Sólo el personal capacitado puede realizar el mantenimiento. En caso de sustitución, utilice únicamente baterías similares a las que debe sustituir. No queme su batería antigua.
2.3.8.2. Instalación Utilice una batería 12 V de 450 A (CCA) de capacidad mínima. El grupo electrógeno utiliza una masa negativa con un circuito eléctrico motor de 12 V. Conecte correctamente la batería, positivo en positivo y negativo en negativo, para evitar una posible descarga eléctrica y daños a la batería o a su cargador.
2.3.8.3. Cargador de batería 2.3.8.3.1. Características Marca: GenPARTS Tipo: ACP2 Tensión de entrada nominal: 230 V CA - 50 Hz / 60 Hz Campo de tensiones: 187 V CA - 305 V CA Salida: 13,2 V DC ; 2,5 A Entorno: o Temperatura de uso: - 20 a + 60 °C o Temperatura de almacenamiento: - 20 a + 70 °C...
1. Dispositivo de calentamiento del carburador (con el filtro de aire extraído para que el dispositivo esté visible) 2. Cable alimentación dispositivo calentamiento del carburador Figura 2.29: Calentador del carburador, RES 9.5 EC / RES 13 EC / RES 12 TEC 32/73...
Page 183
1. Dispositivo de calentamiento del carburador Figura 2.30: Calentador del carburador, en el motor, RES 18 EC / RES 16 TEC 1. Enchufe 2. Termostato 3. Dispositivo de calentamiento Figura 2.31: Dispositivos de calentamiento del carburador con termostato integrado 33/73...
2.3.10 Control de instalación previo al encendido Las comprobaciones mencionadas en este apartado permiten garantizar el funcionamiento del grupo electrógeno. La realización de las operaciones indicadas precisa de conocimientos especiales. Dichas operaciones se deben reservar a personas que posean los conocimientos necesarios. Si no se siguen estas instrucciones existe el riesgo de que se produzcan incidentes o accidentes muy graves.
2.3.11.1. Ajuste de voltaje 1. Con el grupo electrógeno apagado, conecte un multímetro digital a los cables de salida o a una toma eléctrica del lado de alimentación del grupo electrógeno. Ajuste el multímetro para medir el voltaje de CA. 2.
Configuración de las comunicaciones (Código "Cn"). En los modelos RES 9.5 EC / RES 13 EC, este ajuste permite al usuario ajustar el controlador de forma que pueda comunicarse con instrumentos opcionales y sólo está disponible en los modelos marinos y móviles. Los modelos RES 9.5 EC / RES 13 EC se ajustan en fábrica para no disponer de comunicaciones por CAN, Cn00.
Page 187
Voltaje de la batería: Bt12 motor, 12 Vcc Configuración de las Cn00 Sin comunicaciones por CAN comunicaciones Figura 2.34: Ajustes del configuración del controlador, RES 9.5 EC / RES 13 EC Parámetro Código Descripción Uu01 Monofásico, 60 Hz, 120/240 Vca Voltaje y frecuencias...
2.3.13 Modos de ejecución (con el controlador ADC) Método de ajuste de la frecuencia y el voltaje de salida: Pantalla:* Ponga el interruptor principal del grupo electrógeno en la posición "MARCHA". El motor del grupo electrógeno se pone en marcha y el controlador muestra las horas de funcionamiento del motor.
Page 189
Continuación de la figura 2.36: Pantalla:* Pulse: Para cambiar a modo de ajuste basto del regulador de velocidad del motor (Parámetro 4P) Para aumentar o reducir la velocidad del motor en intervalos grandes. Para cambiar a modo de ajuste fino del regulador de velocidad del motor (Parámetro 4P) Para aumentar o reducir la velocidad del motor en intervalos pequeños.
Page 190
Modo de configuración del controlador ADC-RES: Pantalla: Pulse y mantenga pulsado el botón de selección: Ponga el interruptor principal del grupo electrógeno en la posición "MARCHA" (el motor del grupo electrógeno no se pone en marcha). Espere unos cinco segundos, la pantalla mostrará el número de versión del programa (este número puede ser distinto del mostrado aquí).
Page 191
Nota: Los cuadros sombreados indican la cifra mostrada en la pantalla del controlador, valor que se puede modificar pulsando la tecla de flecha ascendente o descendente. Figura 2.40: Modo de configuración (ajustes de voltaje/frecuencia nominales, configuración del grupo electrógeno y del tipo de motor), RES 9.5 EC / RES 13 EC 41/73...
Page 192
Ahora debe ponerse el interruptor principal en "PARO/REINICIO". * En la pantalla de horas de funcionamiento, X indica cualquier cifra entre 0 y 9. Figura 2.42: Modo Guardar (después de la configuración de los parámetros del grupo electrógeno), RES 9.5 EC / RES 13 EC 42/73...
3. Utilización del grupo electrógeno Las figuras 3.1 y 3.2 muestran la interfaz de usuario del controlador digital ADC 2100 y ADC-RES montados en el grupo electrógeno. 1. Pantalla de visualización LED 2. Botón de selección (sólo para configuración y ajustes) 3.
3.1. Comandos y señalización La figura 3.3 detalla los distintos componentes de control y señalización del controlador ADC 2100 o ADC-RES. Control o señal Elemento Descripción Indica el número total de horas de funcionamiento del Horas de grupo electrógeno, siempre que esta funcionando y si no funcionamiento es necesario visualizar algún otro código.
3.1.2 Teclado del controlador Las tres teclas del teclado del controlador son "Seleccionar", "Arriba" y "Abajo" Cuando el grupo electrógeno está en marcha, las teclas de desplazamiento "Arriba" y "Abajo" pueden utilizarse para navegar entre las pantallas de datos del sistema, tal como se muestra en la figura 3.4. Al cabo de 10 s la pantalla vuelve a las horas de funcionamiento del motor.
3.3. Parada del grupo electrógeno Apagado manual 1. Deje que el grupo electrógeno funcione sin carga durante dos minutos como mínimo para que el motor se enfríe lo suficiente. 2. Ponga el interruptor principal del grupo electrógeno en la posición "APAGADO/REINICIO". El grupo electrógeno se apaga. Apagado automático Con el interruptor principal del grupo electrógeno en "AUTO", abra el contacto entre los cables 3 y 4 de puesta en marcha del motor para indicar al grupo electrógeno que se detenga.
Page 205
Código Fallo Descripción Comprobación Apagado por la El equipo se detiene inmediatamente cuando se activa el Comprobar la posición del botón de pulsación del botón de parada de emergencia (sólo modelos trifásicos). parada emergencia (sólo botón de parada No utilizado en modelos monofásicos modelos trifásicos).
Código Fallo Descripción Comprobación Este código de fallo se visualiza si el voltaje de la batería Comprobar especificaciones del arrancador del motor supera los 16 Vcc durante más nominales de la batería y el estado de 30 s con el motor apagado. Estas condiciones de fallo Aviso por voltaje de la misma.
3.6. Corriente del controlador El controlador ADC 2100 o ADC-RES se alimenta con la electricidad de la batería del arrancador del motor del grupo electrógeno. Un caballete situado en la parte posterior del controlador ADC 2100 permite que este reciba constantemente alimentación eléctrica.
4.1. Programa de mantenimiento 4.1.1 Mantenimiento programado RES 9.5 EC / RES 13 EC / RES 12 TEC Naturaleza de la operación Elemento o intervención Frecuencia (1) Inspección Comprobación Sustitución Limpieza Intento visual Carburante Tubos flexibles y rácores Trimestralmente Nivel de llenado del tanque principal Semanalmente Conductos de alimentación...
4.1.2 Mantenimiento programado RES 18 EC / RES 16 TEC Naturaleza de la operación Elemento o intervención Inspección Frecuencia (1) Comprobación Sustitución Limpieza Intento visual Carburante Tubos flexibles y rácores Trimestralmente Nivel de llenado del tanque principal Semanalmente Conductos de alimentación Anualmente Lubricación 8 horas o antes del...
4.1.3 Circuito de lubricación 4.1.3.1. Parada por baja de presión de aceite La función de apagado como resultado de una baja presión de aceite protege el motor frente al riesgo de daños internos, en caso de una caída de la presión de aceite por debajo de un valor mínimo, tras un fallo de la bomba de aceite o cualquier otro fallo. Esta función, sin embargo, no ofrece ninguna protección frente a los daños provocados por hacer funcionar el motor cuando el nivel de aceite está...
4.1.3.4. Proceso de vaciado de aceite motor 4.1.3.4.1. Proceso de vaciado de aceite motor RES 9.5 EC / RES 13 EC / RES 12 TEC Vacíe el aceite mientras aún esté caliente. 1. Vacíe el aceite. a. Abra la puerta de la carcasa.
4.1.3.4.2. Proceso de vaciado de aceite motor RES 18 EC / RES 16 TEC Vacíe el aceite mientras aún esté caliente. 1. Vacíe el aceite. a. Levante el capó del grupo electrógeno. b. Desenrosque los dos tornillos de retención del panel lateral. 1.
2. Sustituya el filtro de aceite. a. Limpie el área alrededor del filtro de aceite. Retire el filtro de aceite girándolo en el sentido contrario a las agujas del reloj con una llave para filtros de aceite. b. Limpie la superficie de contacto del adaptador que toca el filtro de aceite. c.
4.1.5 Bujías de encendido Ajuste la separación de los electrodos de las bujías o sustituya las bujías por otras nuevas si es necesario. 1. Limpie alrededor de los orificios de las bujías para impedir que suciedad o partículas obstructoras penetren en el motor. 2.
4.1.6 Filtro de aire 4.1.6.1. Mantenimiento del filtro del aire RES 9.5 EC / RES 13 EC / RES 12 TEC 4.1.6.1.1. Filtro de aire y prefiltro El aire de admisión del motor se filtra a través de un elemento recambiable de papel de alta densidad y un prefiltro de espuma empapado en aceite.
4.1.6.1.1.1. Mantenimiento del prefiltro Siga los pasos del procedimiento siguiente para limpiar y cambiar el aceite del prefiltro, tal y como se indica en el programa de mantenimiento. Disminuya los intervalos entre las limpiezas y los cambios de aceite del filtro, si las condiciones de uso son muy polvorientas o cargadas de partículas.
4.1.6.2. Mantenimiento del filtro del aire RES 18 EC / RES 16 TEC 4.1.6.2.1. Filtro de aire El aire de la admisión del motor se filtra en un elemento recambiable hecho con papel de alta densidad. Inspeccione el filtro de aire directamente o antes de poner en marcha el grupo electrógeno. Compruebe que el sistema del filtro de aire no está...
4.1.7 Circuito de refrigeración El ventilador motor aspira el aire de refrigeración a través de las aberturas presentes en los laterales y en el lado de la batería del grupo electrógeno. El ventilador del alternador aspira el aire de refrigeración a través de las aberturas presentes en las paredes laterales del forro.
"OFF", el grupo electrógeno puede funcionar, pero la alimentación eléctrica del generador no suministrará corriente a la carga. Valor nominal del Modelo disruptor (amperios) RES 9.5 EC RES 13 EC RES 18 EC RES 12 TEC RES 16 TEC Figura 4.8: Disruptores de línea...
4.1.12.3. Lubricación de cilindros 1. Extraiga las bujías de encendido. 2. Vierta una cucharilla con aceite motor en cada cilindro, a través del agujero de la bujía. Coloque de nuevo las bujías de encendido y coloque los cables en la masa. No vuelva a conectar los cables a las bujías. 3.
5.2. Diagnóstico de averías del grupo electrógeno La figura 5.1 ofrece información detallada sobre determinación de fallos del grupo electrógeno y sus posibles reparaciones. Antes de sustituir cualquier pieza, compruebe que las conexiones eléctricas estén bien apretadas. Fallo(s) Posibles(s) causa(s) Medida(s) correctora(s) Comprobar si hay algún código de fallo en la pantalla del Parada por fallo.
5.3. Códigos de fallo El controlador ADC (Advanced Digital Control) muestra los códigos de fallo para ayudar a diagnosticar las averías. Los códigos de fallo utilizados, su descripción y el procedimiento para su solución se detallan en el cuadro 3.5. Identifique y solucione la causa del origen del fallo.
Figura 5.4: Cuadro de diagnóstico de las averías del cargador de batería 6. Declaración de conformidad "C.E." Nombre y dirección del fabricante: SDMO, 12 bis rue de la Villeneuve, CS 92848, 29228 BREST CEDEX 2, FRANCIA Descripción del equipo Grupo electrógeno...