english
6. Installation
6.1 Erection
The pump must be erected in a frost-free and well-
ventilated room.
In plants for pumping hot media, make
Caution
sure that people cannot accidentally come
into contact with hot surfaces.
A minimum clearance is required above the motor
for inspection and for repairs:
– For pumps with motors up to and including
4 kW: 300 mm.
– For pumps with motors over 5.5 kW, a space of
at least 1 m should be provided by the customer
for a block and tackle.
Motors and pump head (motor and impeller)
Caution
alone may be lifted by the suspension
shackles (if present).
The whole pump must not be lifted by the
suspension shackles. The suspension
shackles are not sufficiently strongly
dimensioned for this purpose.
Space above the motor
0.25 to 4.0 kW
6.2 Connection
The arrows on the pump casing show the direction
of flow of the medium.
Depending on the motor size, the pump can be
installed in horizontal or vertical pipework. Pumps
with motors up to and including 7,5 kW may be
installed in all positions, but the motor must not
point downwards.
LV vent, independently of the direction of
Caution
installation, always in the vertical axis at
the top. Exception:
44
5.5 to 18.5 kW
and
H1
H1a
6.3 Possible methods of installation
Vertical installation
LV
LV
LV
Horizontal installation
LV
H1
LV
H2
LV
H1a
V1
V2
V1a
LV
LV
H3