Télécharger Imprimer la page

BWT Electrolyseur ECO MX Nano Notice De Montage, Mise En Service, Exploitation Et Maintenance page 51

Système de production de chlore sur site par électrolyse de sel

Publicité

Les langues disponibles

Les langues disponibles

In the service menu, press the annual
maintenance counter for 3 seconds, see
opposite.
This will reset the annual maintenance
counter.
- Return the system to operation by following the commissioning procedure.
10.3 GENEral MaINtENaNcE
The system must be subjected to a complete revision every 3 years regardless of the number of
operating hours.
At the end of the 3rd year of operation, a general maintenance alarm will be displayed in the alarm strip.
This intervention must be completed by an authorised BWT technician.
The following interventions must be completed:
- Disconnect the unit's power supply.
- Inspect the whole of the control unit, replace any faulty parts.
- Remove the electrolysis cell and replace with a new one.
- Thoroughly clean the brine and softened water buffer reservoirs. Repeat for the production reservoir.
- Change the solenoid that feeds the brine and softened water buffer reservoirs
- Replace all seals and the VITON o-ring.
- Replace all flexible PE - PTFE - PVC hoses.
- Check all of the contact switches and safety systems, replace where necessary.
- The water softener must undergo a complete revision (see manufacturer's maintenance manual).
- Once the maintenance operations are finished, complete the dedicated service and maintenance
record sheets.
In the service menu, hold down the red
button opposite for 3 seconds.
This will reset the general maintenance
counter.
- Return the system to operation following the procedure described in the "RECOMMISSIONING" chapter.
NB: A log of all maintenance and servicing operations is kept and available exclusively via the "SYSTEM" menu.
Technical manual ECO MX NANO electrolyser - code EN_P0011183 - Rev 7 - 19/04/2019