Télécharger Imprimer la page

BWT Electrolyseur ECO MX Nano Notice De Montage, Mise En Service, Exploitation Et Maintenance page 63

Système de production de chlore sur site par électrolyse de sel

Publicité

Les langues disponibles

Les langues disponibles

Inspection of water softener:
Regeneration signal test:
Hydrogen detector test:
Pressure switch test:
Visual inspection of injection pumps and solenoids:
Visual inspection of reservoirs - cleanliness of seals:
On-site inspections:
Checks completed by:
13.1 UNIT (MAINTENANCE OPERATION)
Switch off power supply.
Do not handle or adjust the electrical servo systems or locking mechanisms.
13.2 sHuttING DoWN tHE INstallatIoN
NotE: If the device is stopped more than 72 hours it may be necessary to rinse the brine pipe (risk of
crystallization and obstruction) unplug the the suction pipe and plunge into a container containing softened
water, unplug the brine pipe at the injection point and put it in a container, manually turn on the brine
pump a few minutes to flush the piping.
13.3 OXIDANT RESERVOIR - PRESENCE OF HYDROGEN
Remove the oxidant reservoir cover.
Ventilate the tank for at least 1H before any maintenance operations. Ensure that the technical area is
Do not add any chemical products into the reservoir.
If it is necessary to physically enter the reservoir, respect all safety instructions concerning confined spaces.
13. MaINtENaNcE
Important:
correctly ventilated.
Technical manual ECO MX NANO electrolyser - code EN_P0011183 - Rev 7 - 19/04/2019
Signature:
63

Publicité

loading