Télécharger Imprimer la page

BWT Electrolyseur ECO MX Nano Notice De Montage, Mise En Service, Exploitation Et Maintenance page 55

Système de production de chlore sur site par électrolyse de sel

Publicité

Les langues disponibles

Les langues disponibles

- Locate the new hose. Ensure that the tube
is well lubricated with silicone grease
Pull the rotor backwards slightly and insert
the tube between the inside of the casing
and the rotor
- Replace the transparent panel
Turn the rotor such that the geared motor
shaft gently aligns with the central "+" mark
Fit the casing to the base and turn clockwise
until it stops
When correctly fitted, the edges will be
aligned with the markings as on base C
- Reconnect the hoses
- Wipe away all chemical solution residue from the system
- Complete the dedicated service sheet for this procedure.
- Return the system to operation following the commissioning procedure
HOSE CONNECTOR
(+)
Casing
Compression nut
Technical manual ECO MX NANO electrolyser - code EN_P0011183 - Rev 7 - 19/04/2019
Rotor
NO HOSE CONNECTOR
Fit
the hose
connector
(b)
(a)
(c)
Install inside
the limits of this
location
Axis
Base
Marking
55

Publicité

loading