Télécharger Imprimer la page

MCZ Star Air Manuel De Fonctionnement Et D'entretien page 28

Publicité

Les langues disponibles

Les langues disponibles

Assembly of profiles to insert in the ceramic and soapstone
sides (for STAR stove only)
Remove, on the upper part, the cast iron top (A).
Take the four profiles (B) to be assembled on the front and rear part of
the stove (two to the right and two to the left). Make sure that the
profile (B) at the bottom enters the in correspondence to the two holes
predisposed on the base for securing purposes, and along the side
enters the blade (B1) predisposed in the stove along its entire height.
Once both profiles are assembled on one side, take the piece (C) with
the four screws (D-E-F-G) and secure it on the upper part of the stove
(F-D) and in correspondence to the element predisposed on the profile
(B2) for screws G-E.
At this point take the ceramics (3 per side) or the soapstone (2 per
side) and insert them on the profile (B) in correspondence to the
element (B3) from above downwards.
You are advised to use small felt pads (two on the
right and two on the left) to be applied at the tips of
the ceramics (inwards) in correspondence to the part
of the tile that comes into contact with the sheet
metal profile (B3).
This prevents the ceramic from coming into contact
with the metallic parts of the structure and
compensates any differences in thickness of the tile.
Repeat the same operation for both sides. Reposition the cast iron top.
Installation and fitting
PELLET STOVES
INSTALLATION AND USE MANUAL
Figure 6 - STAR stove sides
Technical service - Rights reserved MCZ Group S.p.A. - Reproduction prohibited
Chapter 3
28
page

Publicité

loading

Ce manuel est également adapté pour:

Ego air