Télécharger Imprimer la page

MCZ Star Air Manuel De Fonctionnement Et D'entretien page 22

Publicité

Les langues disponibles

Les langues disponibles

Installing through the ceiling vent (method #7)
3.4.2.7.
Through
the
ceiling
recommendations when using wall and ceiling pass through. Note: Do
not place joints within wall pass-throughs.
Minimum flue vent configuration
It is required that outside air be
to reduce smoke and creosote smell in the room in the event of power
failure.
Installation and fitting
PELLET STOVES
INSTALLATION AND USE MANUAL
vent,
follow
PL
vent
installed with this venting configuration
12" min.wall to outlet
36" min clearance to any
combustible material
Shaded area rapresents the
minimum clearance to combustible
materials such as shrubbery,
mulch or tall grasses.
manufacturers
PL vent manufacturer's
firestop spacer and
support
Technical service - Rights reserved MCZ Group S.p.A. - Reproduction prohibited
Chapter 3
22
page
Storm collar
12" min.
Flashing
3" min.
3" min.
3" min.
No insulation or
other combustible
materials are
allowed within
3" of the PL vent
pipe
18"

Publicité

loading

Ce manuel est également adapté pour:

Ego air