Mounting; Mounting Diagram - Ecolab Elados EMP II E60 Mode D'emploi

Masquer les pouces Voir aussi pour Elados EMP II E60:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6

Mounting

The installation must only be performed by authorized personnel and the general guidelines
WARNING
and local installation regulations must be observed!
The metering pump should be fitted in an easy-to-access, frost-free location.
The ambient temperature must not exceed +40° C.
The mounting position of the device must be horizontal.
The pump must be securely screwed to the bracket or the container using the drill holes
provided (for information on the drill hole gap, see chapter
6.1

Mounting diagram

The metering valve, pressure control valve and pressure relief valve can be replaced by a
NOTE
multifunction valve (MFV) from our product range, which combines all of these
functionalities.
417101438_EMP_II_E60
14.2
Pos
Designation
1
Overflow valve
2
Pressure control valve
3
Replacement method: Multifunction valve
4
Suction pipe / bottom admission valve
Fig. 6.1
Mounting diagram
- 83 -
"Dimensions").
Rev. 12-01.19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp ii e60plus

Table des Matières