8.2.3.1
Installing the batch pulse
The batch function must be activated in menu first. The selection must also be made of
NOTE
whether the pins
batch metering start pulse (see chapter
2
+
4
= Input batch metering with potential-free contact with selection input „pulse" at
configuration / batch (see chapter 10.3.15).
PIN
Assignment
2
Relay input
4
GND (┴)
1 +2
+
4
= Input batch metering with electronic switch (NPN) with selection input „pulse" at
configuration / batch (see chapter 10.3.15)
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
or
3
+
4
= Input batch metering with potential-free contact with selection input „metering lock" at
configuration / batch (see chapter 10.3.15).
PIN
Assignment
3
Relay input
4
GND (┴)
1 +3
+
4
= Input batch metering with electronic switch (NPN) with selection input „metering lock" at
configuration / batch (see chapter 10.3.15).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
8.2.3.2
Installing the metering lock (optional connector VII or VIII)
The metering lock function must be activated in menu first. The selection must also be
NOTE
made of whether the pins
used for the metering monitoring input (see chapter 10.3.15).
1 +3
+
4
= Input metering monitoring with electronic switch (NPN) with selection input „metering lock"
at configuration metering monitoring (see chapter 10.3.13).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
417101438_EMP_II_E60
2+4
(input "pulse") or
3+4
10.3.15
2+4
(input "pulse") or
3
+
4
PIN
3
4
Fig. 8.10 Installing the metering lock (optional connector VII or VIII)
- 95 -
(input "metering lock") should be used for the
"Configuration / batch")
Fig. 8.9
Installing the batch impulse
3+4
(input "metering lock") should be
= Input metering monitoring with potential-free
contact, with selection „metering lock" at
configuration metering monitoring
(see chapter 10.3.13).
Assignment
Relay input
GND (┴)
Rev. 12-01.19