Mounting; Fixation - Ecolab PDP II Notice Technique

Pompe doseuse pneumatique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.

Mounting

NOTE
When mounting the pump, take into account the suction height of up to1.5 metres.
IMPORTANT
7.1

Fixation

with screws
Fig. 7.2
Pos.
Description
Screw,
1
Ø max. 6 mm (e.g. M 6)
Washer, DIN 125, AD
2
max. Ø 12,5 mm
Hole pattern see chapter
417101420_pneum_II.doc
PRIOR TO INSTALLATION tighten the pump head screws
diagonally
at
the
(See Fig.7.1, Item 1)!
Tightening torque for metering head screws = 3 - 4 Nm.
It is no longer possible to tighten the screws after installing/fitting
the pump!
Fig. 7.3
Mounting:
13.3
Dimensions.
back
of
the
pump
Wall fixation
with bayonet
Guide bayonet screw (1)
through the hole and then
secure by means of
retaining washer (2).
The bottom part of the
locking unit (3) should be
clipped into the square
hole.
To lock in place, apply
gentle pressure and turn
the bayonet screw one
quarter of a turn to the left
or right.
To release, turn one
quarter of a turn to the left
or right
- 34 -
Fig. 7.1
without
fail
with console
Fig. 7.4
Pos.
Description
1
Thread depth, 10 mm
2
Screw, M6
ATTENTION
Do not screw into the pump
more than 10mm and less than
5mm!
Rev. 4-07.10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pdp 00030 pp 06 fp va pp 06 99 99 21 21 mePdp 00060 pp 06 fp va pp 06 99 99 21 21 mePdp 00120 pp 06 fp va pp 06 99 99 21 21 mePdp 00030 pp 06 fp va pp 06 14 14 21 21 mePdp 00060 pp 06 fp va pp 06 14 14 21 21 mePdp 00120 pp 06 fp va pp 06 14 14 21 21 me ... Afficher tout

Table des Matières