5
Setup
5.1
EMP II E60
Fig. 5.1
EMP II E60 (front view)
5.2
EMP II E60
PLUS
Fig. 5.3
EMP II E60 (front view)
Pos.
Description
1
Suction valve (connection on the suction side)
2
Diaphragm breakage sequence
3
Venting connection (refeeding into the container)
4
Pump head
5
Vent screw
6
Pressure valve (connection on the pressure side)
A
Rail for connecting the dongle box
B
Dongle box
Flow direction of the metering medium
5.3
Indicators / Controls / Jacks
5.3.1
Versions EMP II E60 and EMP II E60
Fig. 5.5
Version EMP II E 60 and EMP II
E60
PLUS
5.3.2
"Dongle box" ports
Fig. 5.6
"Dongle box" ports
417101438_EMP_II_E60
PLUS
Pos.
Description
1.
Control knob for setting the stroke length
2.
Menu/Exit, up arrow key
3.
Menu/Exit, down arrow key
4.
Start/Stop key (Enter function)
5
Test key
6.
Graphical display
input for low-level advance warning and empty report
I
(see chapter
input for pulse- / standard signal and metering lock
II
(see chapter
empty report, fault report and stroke signal
III
(see chapter
IV
mains power supply (see chapter 7.2.5)
Pos.
Description
V
input for oval gear meter
VI
connection for pulse input to EMP pump (input II)
VII
input for batch pulse and metering lock
VIII
input for pulse, standard signal input and metering lock
- 82 -
Fig. 5.2
EMP II E60 (side view)
Fig. 5.4
EMP II E60 (side view)
7.2.2
&
14.3.5.1)
7.2.3
& 14.3.5.2)
7.2.4
& 14.3.5.3)
Rev. 12-01.19