Setup / Mounting; Setup; Mounting / Mounting Diagram - Ecolab Elados EMP KKS - E10 Notice Technique

Pompe doseuse à membrane et à piston
Masquer les pouces Voir aussi pour Elados EMP KKS - E10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

Setup / Mounting

5.1

Setup

Fig. 5.1
Pos.
Description
1
LED green (ready for use)
2
On-/Off Switch
3
Reefeding valve (connection refeeding into the container!)
4
Pump head
5
Stroke length adjustment
6
Pressure valve (connection on the metering output)
7
Suction valve (connection on the suction side)
8
Diaphragm breakage sequence
Flow direction of the metering medium
5.2

Mounting / Mounting diagram

417101338_EMP_KKS_E10
ATTENTION
-
The metering pump should be fitted in an easy-
to-access, frost-free location. The ambient
temperature must not exceed +40° C.
-
The mounting position of the device must be
horizontal.
Pos.
Description
1
Pressure relief valve
2
Metering valve / Pressure control valve
3
Suction pipe / Bottom admission valve
NOTE
Fig. 5.2
30
The installation must only be
performed by authorized
personnel and the general
guidelines and local installation
regulations must be observed!
The metering valve, pressure
control valve and pressure relief
valve can be replaced by a
multifunction valve (MFV) from
our product range, which
combines all of these
functionalities.
Rev: 09-08.12

Publicité

Table des Matières
loading

Table des Matières