Deactivating Of Dongle Box, Ogm; In The Pump Software; Trouble Shooting - Ecolab Elados EMP II E60 Mode D'emploi

Masquer les pouces Voir aussi pour Elados EMP II E60:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

12.2.1
Deactivating of
The following procedure is applied to re-disable a peripheral unit
MicroFlow
PLUS
the pump software.
Cancel the alarm signal which appears by pressing the Start/Stop button.
The following appears in the display unit:
Dongle-Box
Fig. 12.15 Operating faults:
Deactivating of DongleBox in the pump
software 1
Deactivation can be selected by pressing the  or button and
the following is displayed
Dongle-Box
Fig. 12.18 Operating faults:
Deactivating of DongleBox in the pump
software 2
 The setting is taken over through pressing the Start/Stop button
12.3

Trouble shooting

Fault
metering pump does not
work, no display indicator
pump has no suction
despite venting and max.
strokes
metering head is leaky,
medium escapes from the
diaphragm breakage outlet
low-level indicator
appears on the display
despite a full container
Prior to repair and maintenance work and metering of dangerous media, always rinse the
CAUTION
metering head, relieve the pressure pipe and wear protective clothing (protective goggles,
gloves and apron).
Electronics repairs must only be performed by trained electricians, following the safety
regulations of the professional association VB G 4 and ZH 1/11)!
When opening the covers or removing parts, except when this is possible without tools,
CAUTION
voltage-carrying parts may be exposed. Connection points may also be under live
voltages.
Before calibration, maintenance, repairs or replacement of parts, the device must be
disconnected from all voltage sources if it is necessary to open up the device.
417101438_EMP_II_E60
Dongle
Box,
OGM
), which had previously been connected and has then been removed again, in
Fig. 12.16 Operating faults:
Fig. 12.19 Operating faults:
Possible cause
mains power cable damaged
incorrect voltage
deposits, adhesions or drying-out
of the valves
metering head is loose
diaphragm is torn
float of the suction pipe is jammed
suction pipe plug or strapping plug
is loose or not plugged in
suction pipe cable is faulty
,
MicroFlow
PLUS
PLUS
OGM
PLUS
Deactivating of OGM
PLUS
in the pump
software 1
OGM
PLUS
PLUS
Deactivating of OGM
in the pump
software 2
Remedy
change mains power cable
check mains voltage
rinse the metering head through the
suction line, if necessary remove and
clean or replace the valves
screw in the metering head fastening
screw diagonally
replace the diaphragm
unjam the float
tighten the plug, clean the contacts,
check whether the strapping plug is
plugged in
replace the empty report device
- 129 -

in the pump software

(dongle
box,
OGM
MicroFlow
Fig. 12.17 Operating faults:
Deactivating of MicroFlow
software 1
MicroFlow
Fig. 12.20 Operating faults:
Deactivating of MicroFlow
software 2
,
PLUS
PLUS
PLUS
in the pump
PLUS
PLUS
in the pump
Rev. 12-01.19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp ii e60plus

Table des Matières