5.2
Setup
Fig. 2: Structure EMP III
1
Diaphragm breakage sequence
2
Suction valve (connection on the suction side)
3
Pump head
5.2.1
Electronic version
Fig. 3: Electrical version EMP III
1
Control knob for stroke length
2
on/off switch
Equipmentg
(only E00)
Terminal box on motor
(E00/E10)
Mechanical stroke adjustment
(only E10)
On/off switch
(only E00)
Green LED
Assembly, mounting and installation
4
3
Function
Continual operation without ON/OFF switch, without operation lamp
Metering capacity setting
Continual operation (max. stroke frequency)
Pump ready for operation
27
Pressure valve (connection on the pressure side)
Flow direction of the metering medium
green LED (ready for use)
417102233 Rev. 3-03.2019