Setup; Overview; Front Panel - Ecolab Elados EDPL V15 Notice Technique

Pompe doseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

Setup

5.1

Overview

Fig. 5.1
Item
Description
1
Frequency convertor
2
Connection socket power supply
3
Motor control line
4
Encoder sensor line
5
Operator panel / Connections (see chapter 5.2)
6
Pump head
7
Oil level gauge glass
8
Oil filler opening with overpressure cap
9
Oil drain screw
10
Connection for diaphragm sensor / diaphragm breakage drain
11
Suction valve
12
Metering head screws
13
Pressure valve
14
Motor fastening screws
15
Motor
5.2

Front panel

Fig. 5.2
*
The mode always relates to the speed / viscosity relationship.
**
LED green = pump in operation, LED yellow = pump not in operation
***
LED on (green) = metering stroke, LED off = suction stroke
417102213_EDP L_V15.docx
Item
Description
Display (8-segment)
1
Active metering capacity setting in %
2
Fault LED (red)
3
Internal operating mode LED (green)
4
External operating mode LED 4-20 mA (green)
LED metering mode
5
Metering stroke
indicator***
LED metering mode
6
state**
/ Metering stroke
LED metering mode
7
Metering stroke
indicator***
8
Button: Increase value
9
Button: Decrease value
10
Test button
11
Mode button
12
On/off switch
Input for a standard signal 4-20 mA, metering lock
13
(release)
- 39 -
high/low*
/ Operating
state**
medium/medium*
/ Operating
indicator***
low/high*
/ Operating
state**
Rev. 1.10.11
/
/

Publicité

Table des Matières
loading

Table des Matières