Télécharger Imprimer la page

LEGRAND KEOR XPE Serie Manuel De Fonctionnement page 98

Masquer les pouces Voir aussi pour KEOR XPE Serie:

Publicité

Les langues disponibles

Les langues disponibles

Installation et démarrage de l'ASI KEOR XPE
3)
Close RCB of the Power Unit and follow the instructions on the display.
a. PLEASE WAIT The Power Unit is starting the rectifier.
b. CLOSE BCB. The operator is informed to close the BCB switch. The unit is
ready to manage the battery.
Figure 35 - Start sequence of the single Power Unit.
c. PLEASE WAIT The Power Unit is starting the inverter.
d. Close OCB. The operator is informed to close the OCB switch. The unit is
ready to manage the output load and go parallel with the other Power Units.
4)
Power Unit start-up has terminated and it is ready to enter the system.
Position the "ONLINE-OFFLINE" selector in the ONLINE position. The Power Unit
5)
becomes operational in the system .
Installation and start-up of KEOR XPE UPS
Installazione e avviamento KEOR XPE UPS
OMAF9212 REV. A
73

Publicité

Chapitres

loading