Télécharger Imprimer la page

Connection Of The Mbcb Signal Cables; Connection Of The Bus Cables - LEGRAND KEOR XPE Serie Manuel De Fonctionnement

Masquer les pouces Voir aussi pour KEOR XPE Serie:

Publicité

Les langues disponibles

Les langues disponibles

3.4.3 Connection of the MBCB signal cables

To simplify execution, you are advised to lay the MBCB-x signal cables together with the power
interconnection cables.

3.4.4 Connection of the bus cables

Connection of the bus cables is the last operation to carry out to complete installation of the
UPS KEOR XPE system
For cable passage, the sections are set up with a specific cables input positioned at the top of
the individual units.
Both the IOBM module and the POWER UNITS are equipped with specific connection boards,
equipped with two double connectors at each end.
Connection of the cable must be installed in compliance with the information outlined on the
technical documentation relating to the system.
40
OMAF9212 REV. A
Installation and start-up of KEOR XPE UPS
Installation et démarrage de l'ASI KEOR XPE
Installazione e avviamento KEOR XPE UPS

Publicité

Chapitres

loading