Télécharger Imprimer la page

LEGRAND KEOR XPE Serie Manuel De Fonctionnement page 70

Masquer les pouces Voir aussi pour KEOR XPE Serie:

Publicité

Les langues disponibles

Les langues disponibles

Installation et démarrage de l'ASI KEOR XPE
Power (kVA)
Rectifier input (L1-L2-L3-N)
Bypass (L1-L2-L3-N)
Output (L1-L2-L3-N)
Centralised Battery (+B - 0B - -B)
Distributed Battery (+B - 0B - -B)
Ground
Maximum conductor section [mm
Maximum number of conductors per
hole
Locking bolt size
Tightening torque [Nm]
Power (kVA)
Rectifier input (L1-L2-L3-N)
Bypass (L1-L2-L3-N)
Output (L1-L2-L3-N)
Battery (+B - 0B - -B)
Ground
Maximum conductor section
2
(battery( [mm
]
Maximum number of conductors per
hole (battery)
Locking bolt size (battery)
Tightening torque (battery) [Nm]
The cable sections indicated in the previous table are approximate. The cables are dimensioned
in compliance with the standard CEI-UNEL35024/1, using the following data:
➢ unipolar copper cables with PVC insulation and maximum temperature of 70° C
➢ ambient temperature equal to 40° C
➢ maximum length of cables equal to 30 m (drop in voltage < 0.5%)
➢ laying of cables in the slot of the structures or gangways not perforated
Installation and start-up of KEOR XPE UPS
Installazione e avviamento KEOR XPE UPS
2
]
Electrical connection details
700-900-1000
Holes available for each phase
3 x Ø17mm
3 x Ø17mm
3 x Ø17mm
2 x Ø17mm
2 x Ø13mm
Holes available for ground connection
9 x Ø17mm
240
M16 (M12 for Distributed Battery)
128 ÷ 212 (69 ÷ 85 for Distributed Battery)
1800-2100
BUS 60391006P
SUPER COMPACT (SCP) ZUCCHINI
(NOT INCLUDED IN THE SCOPE OF THIS
SUPPLY)
2 x Ø13mm
BUS 60391006P
SUPER COMPACT (SCP) ZUCCHINI
(NOT INCLUDED IN THE SCOPE OF THIS
SUPPLY)
240
M12
69 ÷ 85
1200-1500
400
2
2
OMAF9212 REV. A
45

Publicité

Chapitres

loading