Testing Of The Appliance; Adjustments; Instructions And Warnings For Adjustments; Adjusting The Water Pressure - Angelo Po BX61E Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 74

TESTING OF THE APPLIANCE

Important
Before it is put into service, the system must be tested to check the operating conditions
of every single component and identify any malfunctions. In this stage, it is important to
check that all health and safety requirements have been complied with in full.
To test the system, make the following checks.
1) Turn on the water supply tap and make sure that the connection is watertight.
2) Turn on the master switch to check the electrical connection.
3) Make sure that the mains voltage is the same as that of the appliance and, if necessary, carry
out the conversion (see page 9).
4) Check the water pressure and adjust if necessary (see page 10).
5) Check that the safety device is operating correctly.
6) Carry out a cooking cycle without food to ensure that the appliance is operating correctly.
After testing, if necessary instruct the user in all the skills necessary for putting the appliance
into operation in conditions of safety, in accordance with legal requirements.

INSTRUCTIONS AND WARNINGS FOR ADJUSTMENTS

Important
Before making any type of adjustment, activate all the safety devices provided and decide
whether staff at work and those in the vicinity should be informed.
In particular, turn off the water supply tap, cut off the electricity supply using the master
switch and prevent access to all devices that might cause unexpected health and safety
hazards if turned on.

ADJUSTING THE WATER PRESSURE

To carry out this operation, proceed as follows.
1) Undo the screws to remove the side panel (A).
2) Turn on the water supply tap (B).
3) Unscrew the ring nut (C).
4) Turn the cooking chamber water intake screw (D) to bring the pressure reading on the pres-
sure gauge (E) to 1 bar.
If the water pressure is too low, install a device to increase the pressure.
5) Retighten the ring nut (C).
6) Replace the panel (A) and screw the screws back into place.
7) Turn the water supply tap (B) back off when the operation is complete.
3326460_GB_inst_rev.2

ADJUSTMENTS

E
C
D
A
- 11 -
B
GB
ENGLISH

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bx61erBx101eBx101erBx82eBx122e

Table des Matières