Burkert TopControl Basic 8694 Manuel D'utilisation page 37

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Type 8694
Installation
Figure 25:
Installing the switch spindle (2), series 26xx and 27xx
Press the O-ring downwards into the cover of the actuator.
Actuator size 125 and bigger with high air flow rate:
remove existing spindle extension and replace with the new one. To do this, apply some screw locking paint
(Loctite 290) in the tapped bore of the spindle extension.
Screw the guide element into the cover of the actuator using a face wrench
To secure the switch spindle, apply some screw locking paint (Loctite 290) to the thread of the switch spindle.
Screw the switch spindle onto the spindle extension. To do this, there is a slot on the upper side
(maximum torque: 1 Nm).
Push the puck onto the switch spindle until it engages.
Journal Ø: 3 mm; journal gap: 23.5 mm
13)
Puck
Switch spindle
Guide element
O-ring
Plastic part
(Switch spindle)
Spindle (actuator)
(torque: 8.0 Nm).
13)
english
37

Publicité

Table des Matières
loading

Table des Matières