Télécharger Imprimer la page

Yale BATTERY STAR Notice D'instructions page 19

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 126
MANUAL LOWERING PROCEDURE
The hoist may be operated manually by using an electric drill and an SAE 3/16" socket.
1. Remove the hoist end cap (1) on the motor side of the hoist by removing the four screws (2) as shown below.
2. Remove the motor shaft cover (3) held on by the two screws (4).
3. Use a drill and a socket to spin the motor shaft (5) counter-clockwise to lower the load, or clockwise to raise the load.
4. Replace the motor shaft cover (3) and hoist end cap (1).
Figure 15. Manual Lowering Procedure
BatteryStar
P/N: 192097707YLEM June 2024
19
TM

Publicité

loading