Stryker CUB Pediatric Crib Manuel De Maintenance page 47

Masquer les pouces Voir aussi pour CUB Pediatric Crib:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

LOAD CELL REPLACEMENT (CONTINUED)
9.
Using a 9/16 in. combination wrench, remove the bolt (D), washer (C), and spacer (B) holding the fixed socket (A)
to the accessory bracket. See Figure 16.
10. Using a small regular screwdriver, remove the defective load cell cable from the control board.
11. Pass the connector through the opening in the lower cover plate and remove the defective load cell.
12. Reverse the above steps to install the new load cell. When installing the new load cell, use a 0.036 in. shim to
create a gap between the load cell and the nylon support.
13. Calibrate the scale system (see "Scale System Calibration",
14. Verify proper operation of all scale functions before returning the stretcher to service.
B
A
www.stryker.com
Service
page
B
Figure 15
B
C
D
Figure 16
1900-009-002 REV B
1-17).
POSITION #1
C
D
F
G
E
D
A
Return To Table of Contents
1-45

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Fl19f/h

Table des Matières