INSP
ADJ
1
3
BILGE PUMP/GENERAL
2
Electric bilge pump strainer inspection
1. Inspect:
• Cap
• Strainer
Contaminants → Clean.
Inspection steps:
• Remove the band 1.
• Remove the cap 2 and strainer 3.
• Inspect the cap and strainer.
• Install the strainer and cap.
• Install the band.
GENERAL
Drain plug inspection
1. Inspect:
• Drain plugs
Cracks/damage → Replace.
• O-rings
Cracks/wear → Replace.
• Screw threads
Contaminants → Clean.
3-28
E