Installation Requirements

The ice machine top panel can be trimmed with an
aviator snips to allow the line set, water line and
electrical connections to exit the top. Only cut out
what is needed, the back panel recess sheet metal
must support the top panel.
The ice machine and bin must be level.
Vent the ice machine and bin drains separately.
Bin drain termination must have an air gap.
The water inlet and electrical connection must
contain a service loop to allow future access.
The drain line must contain a union or other suitable
means of disconnection at the ice machine.
The ice machine and bin must be sanitized after
installation.
Routine adjustments and maintenance procedures
outlined in this manual are not covered by the
warranty.
12
Removing Drain Plug and Leveling the Ice
Storage Bin
1. Remove threaded plug from drain fitting.
2. Screw the leveling legs onto the bottom of the bin.
3. Screw the foot of each leg in as far as possible.
! Caution
The legs must be screwed in tightly to prevent them
from bending.
4. Move the bin into its final position.
5. Level the bin to assure that the bin door closes and
seals properly. Use a level on top of the bin. Turn the
base of each foot as necessary to level the bin.
6. Inspect bin gasket prior to ice machine installation.
(Manitowoc bins come with a closed cell foam
gasket installed along the top surface of the bin.)
7. Remove all panels from ice machine before lifting.
and installing on bin. Remove both front panels, top
cover, left and right side panels.
Section 2
Part Number 000007924 5/14