Télécharger Imprimer la page

Bronpi LONDRES Instructions D'installation, D'utilisation Et D'entretien page 45

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
On the other hand, to connect the CairoD air-kit, the
steps to follow are:
-
Screw the two 400 m
/h fans to the appliance, one
3
on each side, the screws required for this operation
are supplied with the kit. (See drawing D2.52). In
order to facilitate this operation it is advisable to
remove (unscrew) the air chamber of the device, so
you can screw the fan better and then replace it (See
drawing D2.53).
-
Connect the two fans to the quick connectors to
allow them to be connected to the control unit.
-
Make the electrical connection of the fans to the
control unit (outputs 5-6), see electrical connection
diagram.
-
Position the temperature
probe in the correct location
and connect the probe to
the control unit (input 9-10),
see electrical connection
diagram.
-
Place the control unit in
the insert cover, as far
away as possible from the
heat source, and protect it
thermally to prevent damage.
-
Make the electrical
connection between the
control unit and the mains
socket of the house (input 1-2), see electrical connection diagram.
-
Finally, if you wish to channel air to other rooms, use a hammer to release at least 2 of the 4 hot air outlets at the top of the insert (see
drawing D2.54). Perform this operation symmetrically to avoid overheating of the insert. Otherwise, with the upper outputs closed, the
air will come out through the front of the device, for which purpose the regulating blade on the front of the device must be open (See
drawing D2.55).
It is possible to direct one or more hot air exits to a different room and not to the one where the insert is installed.
In that case, it is necessary to compensate this exit with a return canalization in order to prevent the room is in depression, with the risks that
this would entail.
The models Cairo and Cairo-E have a ventilation unit (turbine) of 680 m
The ventilation unit takes air through the two side entrances (Ø150mm) of the fan which must be necessarily connected to a duct that takes
air cold enough in order to avoid the overheating of the equipment. This duct must be connected to the outside of the house or at least
outside the masonry built around the insert, aspirating the air of the room where it is installed.
Otherwise, the combustion of the equipment may not be appropriate because the turbine will take the O2 of the air intakes 1 and 2,
diminishing the correct combustion of the equipment. The turbines of the Cairo-D model lack this connection Ø 150 of the turbine.
Do not forget the electrical connection
of 220V and the grounding of the
equipment.
ATTENTION! This factor is crucial for the
proper operation.
PROBE PLACEMENT
The position of the probe is shown in
drawings D2.56 (Cairo and Cairo-E)
D2.57 (Cairo-D)
INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS
D2.50
D2.52
D2.54
/h incorporated in the bottom.
3
D2.56
44
D2.51
D2.53
D2.55
D2.57
INSERTS

Publicité

loading