Télécharger Imprimer la page

Bronpi LONDRES Instructions D'installation, D'utilisation Et D'entretien page 44

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
The baffle plate on 90 and 110 models of the Cairo and
Cairo-E series is supported on the side parts and on the
rear parts (see drawing D2.45):
In the Cairo-D models, after placing the side parts, the
set formed by the deflector and the double combustion
tube must be introduced. First, you must adjust the right
side in its position, exceeding with the deflector the height
of the right side piece, then adjust the left side of the
deflector and move it to the left, to insert it in its correct
position. You must place and screw the screw that assures
its positioning, observe the existing recess in the left side
piece to notice the correct position of the deflector. See
drawing D2.46
AUXILIARY VENTILATION (OPTIONAL: KIT AIRE CAIRO EF AND KIT AIRE CAIRO D for models of the Cairo-90 and Cairo-110 series)
INCLUDED AS STANDARD for model Cairo-70
ATTENTION:
In order to facilitate the installation of the auxiliary fan(s), the installation and electrical connection of the auxiliary fan(s)
must be carried out before installing and/or covering the appliance. With the appliance installed and coated, the ease of
connection will depend on the coating made, so as to allow easy access to the rear of the appliance.
The Cairo-70 model incorporates a 225 m3/h blower as standard, the Cairo and Cairo-E models can optionally incorporate a 680 m
tangential turbine, whereas the Cairo-D would incorporate 2 turbines of 400 m
from the control unit of the equipment, leaving it with natural convection. However, if the insert reaches a temperature above TSI (by default
100°C), the turbine/turbines will work in automatic mode for cooling. The turbine serves to propel the air, never to suck the hot air.
n the Cairo-70 model the blower is installed as standard, therefore,
you do not have to keep in mind the following considerations about the
installation of the blower, which are exclusively for the models of the
Cairo 90 and 110 series. Regarding the connection of the canalisation
pipe, you must follow the same indications:
To install the CairoEF air kit, follow these steps:
-
First of all, the fan must be screwed to the appliance, the
screws required for this operation are supplied with the kit. (See
drawing D2.47).
-
Place the plate plenum that will cover the ventilator, whose
screws will be placed in the plane of fire of the insert itself. (See
drawing D2.48)
-
Connect the ventilation unit to the outside of the house or at
least outside the masonry enclosure built around the insert. This
operation can be carried out with flexible pipe of 120 mm in
diameter. (See drawing D2.49)
-
Make the electrical connection from the fan to the control unit
(outputs 5-6), see electrical connection diagram.
-
Position the temperature probe in the correct location and
connect the probe to the control unit (input 9-10), see electrical
connection diagram.
-
Place the control unit in the cover of the insert, as far away as
possible from the heat source, and protect it thermally to prevent
damage.
-
Make the electrical connection between the control unit and the
mains socket of the house (input 1-2), see electrical connection
diagram.
-
Finally, if you wish to channel air to other rooms, use a hammer to release the 2 hot air outlets at the top of the insert (see diagram
D2.50). Otherwise, with the two upper outlets closed, the air will exit through the front of the appliance. For this, you must have the
regulation blade open located at the front of the insert. (See drawing D2.51)
INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS
/h. In all cases you can disable the operation of the turbine
3
D2.49
43
3
D2.47
D2.45
D2.46
/h
D2.48
INSERTS

Publicité

loading