Chapter 1
Handling the Product
Assembling (continued)
Chain Container Seal
●
A seal in the right to indicate the relation between the size of the Load
Chain and the lift is attached to the Chain Container. Be sure to check
it before installation.
Plastic Container
●
1) Mount the Container Spring to the Chain Guide A.
1
2) Pass a Socket Bolt through all holes of the Chain
Container, the Chain Guide A and the Chain
Container, in this order to mount the Chain
Container.
• Be careful to the direction of the Container Spring.
• As the portion A shown in the right assembly figure, make
sure that the edge of the Container Spring is set out of the
container when assembling.
3) Screw the U nut into the Socket Bolt and tighten it
securely.
• The Socket Bolt must protrude from the end face of the nut
by three threads or more.
Canvas Container
●
1) Pass two Socket Bolts through all
holes of the Chain Guide A, the Canvas
Container and the Chain Guide A in this
order to mount the Chain Container.
2) Screw the U nut securely.
• The Socket Bolt must protrude from the end
face of the nut by three threads or more.
38
Edge of the
Container Spring
Chain Guide A
Socket
Bolt
Names of each part
A
Socket
Bolt
Chain
Guide A
Container Spring
U nut
Chain Container
Assembly figure
U nut
Chain Container