Chapter 1
Handling the Product
Work Flow of Assembling and Installation
The contents of the work to assemble and install the product by the maintenance engineers and installer are described from
this page and after. To eliminate the redo work and for effective assembling and installation, please check the following work
flow first and then start assembling and installation work.
Hook Suspended Type (hoist only)
1
Preparation
Mounting the Chain Container
Lubrication on the Load Chain
Checking gear oil
Checking the power
Checking the breaker ratings
Hook Suspended Type (hoist only)
125 kg~5 t
Connecting the Power Cable
Connecting Push Button Switch Set Cord
Installation of Hook Suspended Type (hoist only)
Connecting Power Cable
to the power
Checking installation method
and place
36
ER2
Assembling Parts to Electric Chain Hoist
Checking Power and Power Cables
Connecting Cables
(P54)
(P57)
Checking and Carrying Out "Check Items"
Carrying Out Operational Check
Trolley Type
Motorized Trolley Type
ER2M
How to use the Oil Cap
(Only for the Friction Clutch with mechanical brake)
Combination with the Motorized Trolley
Part replacement of the electric chain hoist
Checking the rail width of the motorized
trolley
Checking the number and position of
adjusting collars
Combination of the electric chain hoist and
the motorized trolley
Mounting the balance weight
Checking the Power Cable
Permissible cable length and size
Connecting Cables
Motorized Trolley Type
(P55)
125 kg~5 t
Connecting relay cable
Connecting the Power Cable
Connecting Push Button Switch Set Cord
Installation of Trolley Combination Model
Connecting Power Cable to the power
Mounting the Travel Rail
Mounting the Stopper
Power Cable layout of Electric/Manual Trolley Combined Model
Case for cable hanger
Case for T-shape/angle type hanger
Manual Trolley Type
ER2SG / ER2SP
(P37)
Combination with the Manual Trolley
(P42)
Part replacement of the electric chain hoist
Checking the rail width of the manual
trolley
Checking the number and position of
adjusting collars
Combination of the electric chain hoist and
the manual trolley
(P52)
Connecting Cables
Manual Trolley Type
125 kg~5 t
Connecting the Power Cable
Connecting Push Button Switch Set Cord
(P58 to 60)
(P61)
(P61)
(P47)
(P56)