General; Scope Of Guarantee; Contact Address/Manufacturer - Ecolab PDP II Notice Technique

Pompe doseuse pneumatique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.

General

This operating instruction contains all the necessary instructions for the installation, start-up,
maintenance and repair of the
NOTE
The safety notes and emphases must be observed at all times!
1.1

Scope of guarantee

The manufacturer only accepts the guarantee with regard to the operating safety, reliability
and capacity of the metering pump under the following conditions:
• Assembly, connection, adjustment, maintenance and repairs are carried out by
authorized, qualified personnel.
• The metering device is used in accordance with the instructions in the technical manual.
• Only original spare parts are used for repairs.
• If the pump casing is opened, then the guarantee will become void.
The general warranty and performance conditions of
also apply.
1.2

Contact address/manufacturer

ECOLAB Engineering GmbH
Raiffeisenstraße 7
D-83313 Siegsdorf
Tel: (+49) 86 62 / 61 0
Fax: (+49) 86 62 / 61 2 35
E-mail:
engineering-mailbox@ecolab.com
417101420_pneum_II.doc
pneumatic metering pump
The German sections of this manual constitute the ORIGINAL OPERATING MANUAL
and take legal precedence.
All other languages are translations of the ORIGINAL OPERATING MANUAL.
II.
ECOLAB Engineering GmbH
- 28 -
Rev. 4-07.10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pdp 00030 pp 06 fp va pp 06 99 99 21 21 mePdp 00060 pp 06 fp va pp 06 99 99 21 21 mePdp 00120 pp 06 fp va pp 06 99 99 21 21 mePdp 00030 pp 06 fp va pp 06 14 14 21 21 mePdp 00060 pp 06 fp va pp 06 14 14 21 21 mePdp 00120 pp 06 fp va pp 06 14 14 21 21 me ... Afficher tout

Table des Matières