Télécharger Imprimer la page

MOTO GUZZI V750 IE Mode D'emploi page 778

Masquer les pouces Voir aussi pour V750 IE:

Publicité

Les langues disponibles

Les langues disponibles

Engine 750 Euro 4
Fit a new gasket
Place the appropriate ring clamp on the
piston
Place the cylinder so that the piston
correctly enters the seat and as soon
as the segments zone is exceeded re-
move the ring clamp
Specific tooling
020128Y Piston assembly band
After fitting the cylinder it is necessary
to check the piston projection for cor-
rect head gasket selection.
Fit a dial gauge on the specific tool and
set it to zero on a horizontal plane.
Fit the tool together with the dial gauge
on the cylinder and tighten the fixing
nuts.
Detect the deviation on the dial gauge
Specific tooling
020996Y Piston protrusion measuring tool
CAUTION
THE PISTON PROJECTION MUST BE DETECTED BY FITTING THE GASKET BETWEEN CRANK-
CASE AND CYLINDER. BEFORE THE DETECTION TIGHTEN THE CYLINDER UNTIL THE GAS-
KET IS COMPLETELY WOUND
Piston projection
0.40-0.58 mm (0.0157-0.0228 in)
0.20-0.40 mm (0.0079-0.0157 in)
0.02-0.20 mm (0.0008-0.0079 in)
H
EAD GASKET SELECTION
0.6 +/- 0.05 mm (0.0236 +/- 0.0020 in)
0.8 +/- 0.05 mm (0.0315 +/- 0.0020 in)
1.0 +/- 0.05 mm (0.0394 +/- 0.0020 in)
Gasket thickness
Engine
ENG - 83

Publicité

Chapitres

loading