26
26
84
5-36
5-37
5-38
5-39
5-40
Operation
Figure 5-36 OPTIMISATION "OP.2"
START is signalled on the screen.
— Perform a measuring run.
A compensation run is performed.
The OPTIMISATION "OP.3" screen is displayed (Fig.
5-37).
Figure 5-37 OPTIMISATION "OP.3"
—
Mount the tyre correctly on the rim (follow the
centring line) and inflate to specified inflation
pressure.
—
Confi rm by pressing menu key 26.
The OPTIMISATION "OP.4" screen is displayed (Fig.
5-38).
Figure 5-38 OPTIMISATION "OP.4"
(fi rst measuring run with tyre)
— Clamp the wheel on the balancer.
— Position the valve so that it is exactly perpendicular
to and above the chuck.
— Confi rm the valve position by pressing menu key
26.
The OPTIMISATION "OP.5" screen is displayed (Fig.
5-39).
Figure 5-39 OPTIMISATION "OP.5"
START is signalled on the screen.
— Perform a measuring run.
A measuring run is performed.
The OPTIMISATION "OP.6" screen is displayed (Fig.
5-40).