Connection terminals
Cable glands
FE Functional earth
Figure 15: Connecting the cable
→
Connect the device in accordance with the tables.
28
8.3.4
Clip
10
9
1*
2*
3*
Tab. 10: Terminal layout – operating voltage and büS network
* Electrical installation of büS network:
Terminals 1, 2 and 3 (CAN interface) are for the büS
network connection.
Clip 1 is bridged internally with clip 9, however it is not
designed for the operating voltage.
English
Type 3360, 3361
Installing the valve
Terminal layout – operating voltage
büS network
Layout (from device perspective)
CAN shield
24 V
±10%
max. residual ripple 10%
GND
CAN_GND
Only connect when a separate line is used for
CAN.
CAN_H
CAN_L
and