Winkhaus blueMotion Instructions D'installation page 140

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation, Operating and
Maintenance Instructions
EN
3
Figure 3.3.1-2: Detail
frame part 2
Figure 3.3.1-3: Detail
T-KÜ-T1 FT without
cover plate
Aug. Winkhaus GmbH & Co. KG ∙ Berkeser Straße 6 ∙ 98617 Meiningen
T +49  369  3950 - 0 ∙ www.winkhaus.de ∙ Subject to technical changes
blueMotion
Caution! The drillings must be burr-free. The spring must be
kept under a slight pre-tension even with the door being closed
(approx. 10 mm).
• Attach necessary drillings (Ø 13 mm) in the
• Pass the cable with the plug for the motor
• Insert the end of the spring into the sash
• And/or alternatively to the cover plate
• Install the cable for example within the
• Complete the plug-in connection after
• Fix the sash part
CAUTION! Release the second retaining screw
the installation of the door frame into the reveal) when unhinge
the door sash!
Insulate the wires not used!
sash (e.g. in the glazing chamber)
through the door sash
part
into the drilling / routing into the door
sash / cover plate are.
with screw M3 x 12 mm
part
with fitting screw Ø 3 x 20 mm in the
fitting groove.
glazing chamber towards the motor housing;
install the rest of the cable for example within
the hollow section.
Caution! Provide cable reserve of
about 3 - 5 cm for the spring tension
behind the sash part
transition!
putting the door on its hinges
Ø 3 x 20 mm (Figure 1)
36
5044745
fasten the sash
of the cable
with the fitting screw
(e.g. during

Publicité

Table des Matières
loading

Table des Matières