Winkhaus blueMotion Instructions D'installation page 119

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation, Operating and
Maintenance Instructions
No. Name
Power supply
Abbildung 2-1: Power supply
T-HT NETZTEIL 24 V DC / 2,5 A
mounting on DIN rail
Abbildung 2-2: Frame power supply
T-NETZTEILRAHM. 24 V DC 1 A
(2 A / 2 S) (optional) **
including cable for connection of ex-
ternal access controls, e.g. intercom,
potential-free contact
Battery, T-HT AKKU MIT LADESCHAL-
TUNG
Access control system:
shown antenna from the control unit
+ transponder set
Notice: Only install the antenna
from the transponder set in the ex-
ternal zone around the entry door!
External control unit in the housing
EV-G F24 R12
External control unit (for mounting
e.g. in a flush-type box)
"Open" button
"Day / Night service" switch ***
Flush-type box for (10 / 11 / 12)
Handle
*
remaining components recommended for use, or should be used
alternatively
**
when using frame power supply 24 V DC no use as a paniclock in
emergency doors possible (due to lack of combination with battery)
*** Realization of the day function in conjunction with daytime latch, electric
strike with day release or with roller latch
Aug. Winkhaus GmbH & Co. KG ∙ Berkeser Straße 6 ∙ 98617 Meiningen
T +49  369  3950 - 0 ∙ www.winkhaus.de ∙ Subject to technical changes
blueMotion
MUST!
Manda-
tory *
X
15
5044745
Available
Supplied
as on
by
accessory
customer/
or as on
not
option
included
in delivery
X
X
X
X
X
X
X
X
X
EN
2

Publicité

Table des Matières
loading

Table des Matières