Time frame
Type of
maintenance
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
11
1
2
10
12 x / 12
9
3
4
8
5
7
6
12
11
1
2
10
1 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
OPI_SMART LIFT 2.50 SL_V4.0_DE-EN-FR-ES-IT
Maintenance plan
Check the lift spindle for wear (damage).
Lightly oil the lubrication felt between the spindle centring and lift nut.
Use a runny oil similar to SAE 15 W 40. Nut lubrication is done with
an oil can between the column and spindle cover panel (removed if
needed).
Do not use adhesive oil. Biologically degrading adhesive
oil hardens and can lead to damage of the lift. Normal
adhesive oil negatively impacts the running properties
We recommend using a runny oil, similar to SAE 15W40.
Optical wear measurement:
Catch bar fixation "Safety kit" must be integrated,
!
see Section 9.1.
To check the carrier nut, the cover of the lift spindle must be removed.
There is a carrier nut wear gauge pin integrated into the carrier
plate. This must be flush with the upper edge of the carrier plate (in
the lifting rail, top) - see Figure above.
To a): Changes to manufacturer-specific inspection
1. A wear dimension of 2 mm applies to lifts less than 15 years old.
2. A wear dimension of 1 mm applies to lifts older than 15 years.
Check the position of the capture
hook.
Lower the lift completely. Remove the
cover panels and pull them out up-
wards. Now the position of the cap-
ture hook can be checked through
the holes in the lifting rails. These
must align with the latch.
For platforms above serial number:
379231, the catch can be addition-
ally checked through the holes in the
lifting rails.
a
Pos.
C
D
E
Openings in
the lifting rails
95