Télécharger Imprimer la page

Nussbaum SMART LIFT 2.50 SL Manuel D'exploitation page 80

Publicité

Made
in
Germany
2.3 Changes to the design / construction
Inspections by a technical expert are required before recommissioning (date, type of change, technical expert signa-
ture).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
2.4 Changing the assembly location
Inspections by a technical expert are required before recommissioning (date, type of change, specialist signature).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
80
_________________________________________________
Technical expert signature
_________________________________________________
Signature of Technical Expert of Safety inspections
OPI_SMART LIFT 2.50 SL_V4.0_DE-EN-FR-ES-IT

Publicité

loading