Télécharger Imprimer la page

Salicru SLC CUBE 4 7.5 kVA Mode D'emploi page 76

Publicité

Les langues disponibles

Les langues disponibles

General index
1. INTRODUCTION
1.1.
THANK-YOU LETTER
2. SAFETY INFORMATION
2.1.
USING THIS MANUAL
2.1.1.
Conventions and symbols
2.1.2.
Safety considerations
3. QUALITY ASSURANCE AND STANDARDS
3.1.
MANAGEMENT STATEMENT
3.2. STANDARDS
3.2.1.
First and second environment
3.2.1.1.
First environment
3.2.1.2. Second environment
3.3. UKCA PRODUCT MARK AND UK AUTHORIZED
REPRESENTATIVE.
3.4. ENVIRONMENT
4. PRESENTATION
4.1.
VIEWS OF THE CABINETS
4.1.1.
UPS cabinets, tower version.
4.1.2.
Battery cabinets, rack version.
4.1.3.
Armarios de baterías.
4.2. PRODUCT DEFINITION.
4.2.1.
UPS and battery module nomenclature.
4.3. UPS CHARACTERISTICS LABEL.
4.4. UPS DESCRIPTION.
4.4.1.
General description and block diagram.
4.4.2. Rectifier-booster.
4.4.3. Inverter.
4.4.4. Batteries and battery charger.
4.4.5. Static bypass.
4.4.6. Manual or maintenance bypass.
4.4.7.
Input-output configurations.
4.5. OPERATING MODES.
4.5.1.
Normal mode.
4.5.2. Battery mode
4.5.3. Bypass mode.
4.5.4. Maintenance bypass mode
4.5.5.
ECO mode
4.5.6. Frequency converter mode
4.5.7.
Standby mode
76
4.6. OPERATION AND CONTROL DEVICES
4.6.1.
Switches
4.6.2. Control panel with touchscreen
4.6.3. External interface and communications
4.6.3.1. Digital inputs, relay interface and communications
4.6.3.2. Manual bypass auxiliary contact terminals (EMBS).
4.6.3.3. EPO (Emergency Power Off) terminals.
5. INSTALLATION
5.1.
RECEPTION.
5.1.1.
Reception, unpacking and contents
5.1.2.
Storage
5.1.3.
Unpacking
5.1.4. Unpacking rack-type models.
5.1.5.
Transport to the site
5.1.6.
Siting, immobilisation and considerations
5.1.6.1.
Siting for single units
5.1.6.2. Siting for parallel systems.
5.1.6.3.
Immobilisation and levelling of the unit
5.1.6.4. Preliminary considerations before connection
5.1.6.5. Preliminary considerations before connection, regarding
the batteries and their protection devices.
5.2. CONNECTIONS
5.2.1.
Connection to the mains, input terminals
5.2.2. Connection of the separate static bypass line. CUBE4 B
version.
5.2.3. Connection of the output, output terminals
5.2.4. Connection of the unit's battery terminals to those of the
battery module.
5.2.5. Installation of the rack version UPS.
5.2.6. Instalación de tarjetas SNMP.
6. OPERATION
6.1.
UPS START-UP
6.1.1.
Checks before start-up
6.1.2.
Initial start-up
6.1.3.
Generic start-up procedure (normal mode)
6.1.4.
UPS start-up without mains power – Cold Start (battery
mode)
6.1.5.
Procedure for transferring to bypass mode.
6.2. PROCEDURE FOR STOPPING THE UPS.
6.3. MANUAL OR MAINTENANCE BYPASS.
6.3.1.
Transferring to maintenance bypass mode.
6.3.2. Transferring back to normal mode (from maintenance
bypass mode).
SALICRU

Publicité

loading

Ce manuel est également adapté pour:

Slc cube 4 10 kvaSlc cube 4 15 kvaSlc cube 4 20 kva