20/22
APAS test device CT-H | Maintenance and inspection
Bosch Rexroth AG, edition 08.2021, 3 842 562 818
6 Maintenance and
inspection
This section explains how to perform the necessary maintenance
work. Maintenance is performed by a commissioning specialist of the
APAS test device CT-H or a system integrator according to section 2.4.
6.1
Maintenance and cleaning
Maintenance and cleaning work according to the following table must be
observed.
Table 8: Maintenance plan APAS test device CT-H
Maintenance work
Notices
Visual inspection
If you notice visible damage,
contact the manufacturer for
a general overhaul.
Cleaning of the
The components must not be
surfaces of the
cleaned wet; use a dry or slightly
APAS test device CT-H
damp cleaning cloth for the handle
incl. accessories
and connection cables. The foam
spacers may only be cleaned dry.
Only use soft, lint-free cloths for
cleaning. Only use pH-neutral or
slightly alkaline cleaning agents.
Self-test
According to section 5.2
Inspection of the
Complete check by the
APAS test device
manufacturer according to section
incl. accessories
6.2. A general overhaul may be
required to extend the service life.
6.2
Inspection
Risk of injury and damage due to acceptance and operational release of
machines using unauthorized test equipment.
The APAS test device is regularly monitored as part of a test
equipment management system.
The APAS test device is a testing device and should be inspected
at regular intervals according to table 8 by the manufacturer or
a service partner authorized by the manufacturer and, in the event
of deviations, given a general overhaul in order to detect changes in
the relevant product properties due to aging or use and to ensure
proper functioning. Calibration is not intended, a test certifi cate is
issued. Please contact the manufacturer if necessary. For this purpose,
please use the contact options listed in the imprint and on the
APAS website: www.boschrexroth.com/APAS.
WARNING
Interval
During each
commissioning
If contamination is
detected during the
visual inspection
During each
commissioning
Every 36 months