Connecting The Control Panel - Sentiotec Pro D Serie Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation instructions, for professionals only

5.2. Connecting the control panel

1. Feed the connection cable for the control panel through the cable gland 4
into the low-voltage connection area 1.
2. Connect the plug of the RJ-10 cable to the connection socket h.
The sauna control units of the Pro D series enable operation of up to
2 Pro D control panels and an additional output control panel on one
power supply unit. Always use the "Y adapter" supplied with the control
panel for connecting the optional control panel ("3.2. Optional acces-
sories" on page 10).
WORLD OF WELLNESS
Fig. 9 Connection example of the Pro D3i
p. 28/70

Publicité

Table des Matières
loading

Table des Matières