Mettler Toledo IND570 Manuel D'installation page 97

Masquer les pouces Voir aussi pour IND570:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 330
2.4.6.9.
PROFIBUS PLC Option (Harsh Enclosure)
The PROFIBUS PLC option board (Figure 2-115) is installed in position 3 (Figure 2-94) on the
main board. Connection to the PROFIBUS board in the harsh enclosure (Figure 2-115) is made
using a right-angle nine-pin connector inside the IND570 enclosure. This connector is a standard
Siemens part # 6ES7 972-0BA12-0XA0 or equivalent. It is not supplied by METTLER TOLEDO.
There are two nine-pin connectors on the PROFIBUS board – use the connector and cable routing
shown in Figure 2-116. Refer to Figure 2-114 for the PROFIBUS nine-pin connector assignments
and follow the wiring instructions included with the connector to terminate the wires.
2-64
METTLER TOLEDO IND570 Terminal Installation Manual
Pin
Signal
1
Not used
2
Not used
3
RxD/TxD +
4
RTS
5
GND bus
6
+5V bus
7
Not used
8
RxD/TxD -
9
Not used
Figure 2-114: PROFIBUS Nine-Pin Connector Assignments
Figure 2-115: PROFIBUS Option Board for Harsh Enclosure
NOTES:
1. USE MATING CONNECTORS AND CABLE
RECOMMENDED FOR PROFIBUS
CONNECTIONS.
2. REFER TO PROFIBUS INTERNATIONAL
DOCUMENTATION FOR OTHER
CONSIDERATIONS.
30205319
|
11
|
07/2019

Publicité

Table des Matières
loading

Table des Matières