INSTALLATION

Install the mixing point on level ground at the work site and in
such a way that it is not an obstacle during the work and also
not during the subsequent cleaning process. The hoses must
be kept as short as possible.
- Block the wheel with the brake.
- Set up the mixer so that no liquids (e.g. rain) can get into the
hopper.
4.1

ELECTRICAL CONNECTION

Check that the supply voltage, mains fre-
quency and power connection (socket,
fuses, cable) correspond to the information
on the rating plate.
The electrical power socket must be fitted with protection
against current overload (e.g. by means of fuses or a thermal
magnetic cut-out) and against dispersion current to earth (e.g.
with a differential circuit breaker). The electric cable wire size
must take into account the operating currents and length of
the line to avoid excessive voltage drops.
WARNING! Use only extension cables with
a cross-section of 3x2.5 mm². Do not use
cable drums.
The power cable must be suitable for frequent movements and
with an abrasion resistant sheath (e.g. type H07RN-F).
Before connecting the mixer to the electrical mains, ensure that
all safety devices are fitted and are in perfect condition. Check
that the extension cable is in a good condition and that the
sockets and plugs are dry.
Connect the mixer socket on the electrical panel to the mains
(fig. 7, 1).
Connect the plug with the mains. The blue pilot lamp (fig. 7, 2)
lights up in the control panel.
If the pilot lamp does not light up, there is either no electricity
or the voltage is greater than 240 V.
2
1
4.2

WATER CONNECTION

Connect the water connection (fig. 8, 1) with the water network.
The water system must be able to ensure a
delivery rate of at least 15 l/min and a minimum
pressure of 2.5 bar.
If the water supply is not sufficient, a water tank of about 200
litres (must be kept full during operation) of clean water can
be used.
Connect a max. 3-m long hose (minimum diameter 3/4", pre-
ferably with floor filter), which cannot become misshapen du-
ring operation, to the pressure booster pump (fig. 8, 1).
Important. When connecting it to the water
tank for the first time, and whenever the water
system is emptied or after the machine has
been at standstill for a long time, the suction
hose has to be filled by hand in order to put
the pump into operation.
Connect the hose to the water tank.
Set the on/off pump switch (fig. 8, 2) to I and the green pilot
lamp (3) lights up.