COMMISSIONING

6.1

INSTALLATION LOCATION

material to be processed is to be pumped have to be set up on
an even and firm underground. This ensures that the machine
6.1.1
CONNECTION TO MAINS POWER SUPPLY/
EXTENSION CABLE
Connection to the mains network only via a special feed-
ing point, for example via a distribution board for con-
struction sites, with residual current protective device
with INF ≤ 30 mA.
danger of stumbling.
Protect against damage, for example against
being driven over.
Min. wire cross-section 3 x 1.5 mm
coupling pieces and plugs are free of dam-
age.
the line voltage matches that specified on the rating plate.
6.2

INITIAL STARTING-UP

6.2.1
SCOPE OF SUPPLY
individual components:
and transport frame with wheels
Pump unit complete
Hose package
Pump sliding means
6.2.2
ASSEMBLY
frame (2) until the machine engages in the top position.
824).
troller (5) to „0".
The operation light (6) shows operational readiness.
The red indicator light (7) flashes during the function check
for about 30 seconds.
Fold locking pins (8) up towards the magnet holders in the
Slide pump unit (9) over rotor (3) from below and press up-
wards.
Set selector switch (4) to "F" to switch on pump. The pump unit
As soon as the pump unit is in its end position, fold the two
locking pins (8) down and use nuts to fix the pump unit.
2
. Unroll the
Set selector switch (4) to "A" to switch off pump.
Disconnect mains plug.
4
5
-
Only the person controlling the machine
may assemble the pump unit.
Never operate mortar spraying machine
with an exposed rotor.
Do not reach into the rotor when it is
moving. Risk of crushing.
Caution if you have long hair. Only wear
close-fitting clothes at work.
move locking pins 8) into end position.
After assembling the pump unit, secure the
union nut (10) on the pump unit, using the
6
POWER
7
ERROR
A
R
F
8
3
9
10
GB
COMMISSIONING
POWER
ERROR
A
R
F
2
1
41

Publicité

Table des Matières
loading

Table des Matières