Automatic Transfer Switch
CONNECTIONS
ATyS 6s, 6e
Voltage sensing and power supply kit
>
STEP 2: Sources (cables) entry
The standard kit is delivered from factory for sources
bottom entry (bridging bars on the top).
• Bottom sources (cables) entry
Load
Sources
• Black wires on switch I
• Red wires on switch II
Verify kit orientation before kit mounting:
kit output cables always on the right
(control module side).
98
ATyS
• Top sources (cables) entry
• Black wires on switch II
• Red wires on switch I
Power circuits
Control circuits
Voltage sensing and
power supply kit
Sources
Load
SOCOMEC - Réf.: 531 848 F