1
1
Install the O-ring on the seal support.
Install the back-up ring (pos. , Fig. 56), the three packings,
making sure the notches are at 120° from each other (pos. ,
2
Fig. 57),the packing scraper ring and the spring ring (pos. ,
Fig. 58).
1
Fig. 53
1
Fig. 54
1
Fig. 55
33
Fig. 56
Fig. 57
2
Fig. 58