Télécharger Imprimer la page

Horizon Hobby E-FLITE Turbo Timber SWS 2.0m EFL71750 Manuel D'utilisation page 14

Publicité

Les langues disponibles

Les langues disponibles

EN
Cowling Installation ARF/BNF Basic
1. Guide the wiring for the lighting in the cowling through the hole in the firewall.
2. Slide the cowl into position, aligning the holes in the cowling with the holes in
the fuselage.
3. Secure the cowling using four M2.5 x 8mm sheet metal screws and a Phillips
screwdriver (PH#1).
4. Connect the lighting lead to the harness inside the fuselage.
14
Turbo Timber SWS 2.0m

Publicité

loading

Ce manuel est également adapté pour:

E-flite turbo timber sws 2.0m efl71765