First Ignition; Pellet Loading - Palazzetti IDRO INSERTION Manuel D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9

FIRST IGNITION

The first ignition must be carried out
by the installer.
9.1

Pellet loading

The pellets must be loaded from a door which
must be provided in the hood of the cladding
and connected to the appliance through the
appropriate accessories (optional), carefully fol-
lowing the assembly instructions
Do not use the extraction system of the
appliance as a means to load the pellet
hopper.
The use of original accessories is
recommended.
Pellets falling outside the hopper may
damage the operation of the appliance
and cause fires.
The pipe for pellet loading (optional) must act
exclusively as a ramp to fill the hopper of the
appliance and not as an extension of the hopper
itself; avoid loading more pellets than the hopper
can hold.
5.1.14
Optionals available
• Pellet loading with flexible hose kit (A - Fig. 33).
• Finishing frame (B - Fig. 34).
• Pedestal (C - Fig. 34).
004778730 - 24/06/2021
ITALIANO
ENGLISH
B
C
FRANÇAIS
A
Fig. 33
Fig. 34
83

Publicité

Table des Matières
loading

Table des Matières