Télécharger Imprimer la page

Mondolfo Ferro AS944TI Manuel D'utilisation page 22

Masquer les pouces Voir aussi pour AS944TI:

Publicité

Les langues disponibles

Les langues disponibles

- Insert pin E into hole F and into U-bolt F1 on the tower tilt cylinder and lock with ring M.
- Connect hose G to the intermediate connection linked to the tower-lifting cock H.
- Fit the box with pressure gauge 3 on to the tower 1 and lock with screw and washer S.
- Fit the tower guard 2 and lock with screws and washers L.
- Insert the tank 4 outlet into hose Q. Fix the tank 4 to the machine with nuts and washers
R and tighten clamp O on hose Q.
- Fit the side cover (Fig. 4a).
4. HOISTING/HANDLING
In order to remove the machine from the pallet,
hook it as shown in fig.6.
This hoisting point must be used whenever you
need to change the installation position of the
machine. Do not attempt to move the machine
until it has been disconnected from the electricity
and compressed air supply systems.
4.1 INSTALLATION CLEARANCES
The machine must be installed in accordance with all applicable safety regula-
tions, including but not limited to those issued by OSHA.
RISK OF EXPLOSION OR FIRE. Never use the machine in an area where it will be
exposed to flammable vapours (gasoline, paint thinners solvents, etc.). Never install
the machine in a recessed area or below floor level.
22
WARNING
DANGER
6
AS 944 TI User Manual

Publicité

loading